My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 7/9/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Engineering Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 9:48:05 AM
Creation date
7/23/2019 9:47:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
7/9/2019
Council Approval Date
7/3/2019
End Date
6/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Update Comprehensive Water Plan
Public Works WO Number
UP3718
Tracking Number
0001899
Total Compensation
$760,233.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Evaluate and assist the City in formulating earthquake resistant pipe policy which will be <br /> incorporated into the CWP. <br /> 5. Prepare brief summary text for the CWP documenting recent steps taken to evaluate and <br /> improve resiliency. <br /> 4.3 City Responsibilities <br /> 1. Meet with HDR in up to two 3-hour sessions to review the City's resiliency evaluations, and an <br /> additional 2 hour session to review findings from the gap assessment. <br /> 2. Provide available data to HDR, including the City's 2002 Vulnerability Assessment and 2012 <br /> Water System Vulnerability Assessment. <br /> 3. Provide previously performed hydraulics evaluation and preliminary design of Panther Creek <br /> piping improvements connections and valve station configuration <br /> 4. Provide as-built drawings of Reservoir No. 3 primarily related to the buried concrete reservoir <br /> and associated yard piping to existing pump stations. <br /> 5. Provide confined space entry personnel and equipment(i.e., tripods, fans, ventilation, etc.) at <br /> Reservoir No. 3 including ladders or scissors lifts to inspect the ceiling. <br /> 4.4 Assumptions <br /> 1. HDR does not currently have full information needed to fully scope new or updated evaluations <br /> that may be necessary in order for the City to certify its compliance with AWIA Section 2013. <br /> Performance of updated risk and resilience evaluation will be limited to those that can be <br /> completed using the budgetary resources assigned to this task. This task may result in scoping <br /> of more in-depth analysis to be addressed by City staff or through a contract amendment. <br /> 2. This task does not include updating or preparing an emergency response plan in compliance <br /> with AWIA. If the review included in this task demonstrates a need to update or prepare an ERP, <br /> the necessary services would be contracted through a contract amendment. <br /> 3. The City will temporarily take Reservoir No. 3 out of service and drain it to allow HDR to perform <br /> a visual site inspection of the reservoir. Inspection will not include invasive testing or structural <br /> analysis. <br /> 4.5 Deliverables <br /> 1. Technical memorandum of up to 15 pages outlining requirements of AWIA S2013, findings <br /> regarding the City's compliance based on prior and existing assessments, and recommendations <br /> for steps necessary to become compliant, if applicable. <br /> 2. Technical memorandum of findings and recommendations regarding potential improvements at <br /> Reservoir No. 3 and Panther Creek Facility. <br /> 3. Draft text for inclusion in the CWP summarizing the City's recent and planned actions to improve <br /> resiliency against natural hazards and malevolent acts (limited to information that will not <br /> undermine security). <br /> Everett Comprehensive Water Plan June 12, 2019 <br /> Exhibit A—Scope of Services Page 6 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.