My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 7/9/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Engineering Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 9:48:05 AM
Creation date
7/23/2019 9:47:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
7/9/2019
Council Approval Date
7/3/2019
End Date
6/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Update Comprehensive Water Plan
Public Works WO Number
UP3718
Tracking Number
0001899
Total Compensation
$760,233.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FYR <br /> 5. Table and chart showing how the conservation program affects the forecast of future water <br /> requirements. <br /> 6. Updated Water Shortage Contingency Plan. <br /> Task 8 Water Rights and Water Source Reliability <br /> 8.1 Objective <br /> Review and update the City's water rights and system reliability analysis. <br /> 8.2 HDR Services <br /> 1. Meet with the City to review the water rights summary table included in the 2014 CWP <br /> Addendum. Use City input to make adjustments as needed to the inventory of existing water <br /> rights. <br /> 2. Use updated water supply requirements from Task 6 to update the self-assessment of <br /> forecasted water right status from the 2014 CWP Addendum. <br /> 3. Update the status of existing or proposed interties reported in the 2007 CWP. <br /> 4. Update the source of supply analysis from the 2007 CWP to determine the adequacy of water <br /> supply available to meet future demands. Describe the City's efforts related to maintaining <br /> adequate sources of supply and demonstrate that the sources of supply are within the amounts <br /> authorized under the City's existing water rights adequacy, and facility reliability. <br /> 5. Update the water source reliability analysis describing existing and/or proposed water system <br /> supply and distribution of the needed water quantities to meet forecast system demands. <br /> Incorporate results of the yield analysis described in Task 9. <br /> 8.3 City Responsibilities <br /> 1. Provide sufficient information regarding existing water rights and pending applications to enable <br /> completion of Tables 3 and 4 in the 1997 DOH Water System Planning Handbook. <br /> 2. Provide information for preparation of the Source Reliability Analysis and Watershed Control <br /> Program. <br /> 8.4 Assumptions <br /> 1. The water rights information from the City's 2014 CWP Addendum is considered to be accurate. <br /> There have been minimal or no changes since it was prepared, so the update will not require <br /> intensive analysis of water rights. <br /> 2. The City will provide updated water rights information with any changes/additions from the 2014 <br /> CWP Addendum. <br /> 3. One meeting will be sufficient with City staff to verify accuracy of City's existing water rights, <br /> including both primary and supplemental water rights. This meeting can be combined with one <br /> Everett Comprehensive Water Plan June 12, 2019 <br /> Exhibit A—Scope of Services Page 11 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.