My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 7/9/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Engineering Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 9:48:05 AM
Creation date
7/23/2019 9:47:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
7/9/2019
Council Approval Date
7/3/2019
End Date
6/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Update Comprehensive Water Plan
Public Works WO Number
UP3718
Tracking Number
0001899
Total Compensation
$760,233.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FYR <br /> 14.4 Assumptions <br /> 1. No major updates will be made to this chapter besides revisions to update minor changes since <br /> 2014. <br /> 2. City staff will have lead responsibility to identify and describe updated practices for O&M. HDR <br /> will use the information provided to update the associated chapter of the CWP. <br /> 14.5 Deliverables <br /> 1. Chapter for CWP covering Operations and Maintenance <br /> 2. List of O&M improvements to be included in the CIP. <br /> Task 15 Design and Construction Standards and <br /> Specifications Update <br /> 15.1 Objective <br /> Document and summarize the City's water system Design and Construction Standards that are used <br /> for planning, design, and operation of the water system. <br /> 15.2 HDR Services <br /> 1. Project Review Procedures- Review and document the City's in-house review procedures for <br /> new water projects <br /> 2. Identify specific design and construction standards requirements for outside parties. <br /> 3. Review and comment on existing City Design Standards: <br /> • Use existing Design Standards as a starting point to suggest revisions and/or updated <br /> standards. <br /> • Research other utilities design standards to identify if any standards are missing from the <br /> Everett list. <br /> 4. Construction Standards and Specifications <br /> • Use existing Construction Standards and Specifications as a starting point to suggest <br /> revisions and/or updated Construction Standards and Specifications. <br /> • Research other utilities construction standards to identify if any standards are missing from <br /> the Everett list. <br /> 15.3 City Responsibilities <br /> 1. Provide a copy of the existing Design and Construction Standards. <br /> 2. Review draft set of Standards as produced by HDR. <br /> Everett Comprehensive Water Plan June 12, 2019 <br /> Exhibit A—Scope of Services Page 25 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.