Laserfiche WebLink
FYR <br /> 14.4 Assumptions <br /> 1. No major updates will be made to this chapter besides revisions to update minor changes since <br /> 2014. <br /> 2. City staff will have lead responsibility to identify and describe updated practices for O&M. HDR <br /> will use the information provided to update the associated chapter of the CWP. <br /> 14.5 Deliverables <br /> 1. Chapter for CWP covering Operations and Maintenance <br /> 2. List of O&M improvements to be included in the CIP. <br /> Task 15 Design and Construction Standards and <br /> Specifications Update <br /> 15.1 Objective <br /> Document and summarize the City's water system Design and Construction Standards that are used <br /> for planning, design, and operation of the water system. <br /> 15.2 HDR Services <br /> 1. Project Review Procedures- Review and document the City's in-house review procedures for <br /> new water projects <br /> 2. Identify specific design and construction standards requirements for outside parties. <br /> 3. Review and comment on existing City Design Standards: <br /> • Use existing Design Standards as a starting point to suggest revisions and/or updated <br /> standards. <br /> • Research other utilities design standards to identify if any standards are missing from the <br /> Everett list. <br /> 4. Construction Standards and Specifications <br /> • Use existing Construction Standards and Specifications as a starting point to suggest <br /> revisions and/or updated Construction Standards and Specifications. <br /> • Research other utilities construction standards to identify if any standards are missing from <br /> the Everett list. <br /> 15.3 City Responsibilities <br /> 1. Provide a copy of the existing Design and Construction Standards. <br /> 2. Review draft set of Standards as produced by HDR. <br /> Everett Comprehensive Water Plan June 12, 2019 <br /> Exhibit A—Scope of Services Page 25 of 30 <br />