My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 132-71
>
Ordinances
>
Ordinance 132-71
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 10:57:07 AM
Creation date
7/23/2019 10:57:04 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
132-71
Date
3/17/1971
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d) On Domestic water heater installations dialectric fittings shall be <br /> used between dissimiliar metals. <br /> (e) Inspection. No water piping system or part thereof, shall be <br /> covered or concealed until it has first been inspected and approved by the <br /> Administrative Authority. <br /> (f) Testing. Before such approval, both hot and cold water piping shall <br /> be subjected to a full working water pressure test from the street main or other <br /> source of supply, or to an air pressure of not less than fifty (50) pounds per <br /> square inch for not less than fifteen (15) minutes. Piping must not leak when <br /> subjected to such test. " <br /> Section 16: Ordinance No. 3838, Everett City Code 2. 16. 010 through <br /> 2. 16. 230, is hereby repealed. <br /> ATTEST: ROBERT C. ANDERSON <br /> MAYOR <br /> AIp r <br /> • -r- " 1y er <br /> Passed: 7 "7 <br /> Valid: —/ P 7 <br /> Published: —( <br /> Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.