My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 75-70
>
Ordinances
>
Ordinance 75-70
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 10:19:43 AM
Creation date
7/25/2019 10:19:37 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
75-70
Date
4/29/1970
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(N) Refund of Fees <br /> Should any construction, installation, alteration or repairs, for <br /> which an electrical permit fee has been paid, not be carried on, <br /> or should any permit be issued for an incorrect address, the Electrical <br /> Inspector, upon proper application for refund and surrender of the <br /> permit for cancellation, and upon being satisfied, after a survey of <br /> the premises, that such work will not be performed, shall, by <br /> verified statement, so notify the City Treasurer, advising him also <br /> of the amount of the fee to be refunded. In such cases, the Electrical <br /> Inspector shall cancel the permit and the fee shall be refunded less <br /> three dollars to cover the cost of administration of the permit. <br /> Where a reduction in the contract price has been made through an <br /> addendum change to plans or specifications the refund shall be <br /> proportionate to the change made. Where plans and specifications <br /> have been checked no plan checking fee may be refunded. Upon <br /> receipt of notice to refund fee, the City Treasurer shall draw <br /> and pay a warrant upon the general fund in the amount of the refund <br /> so stated by the Electrical Inspector to be due. <br /> Section 11: ELECTRICAL WORK INSPECTION REQUIRED: <br /> No owner, contractor, or other persons engaged in the construction of any <br /> building or structure or otherwise, shall do or permit to be done any work <br /> of any kind whatsoever which will cover or conceal in any way electrical <br /> equipment, until the same has been inspected and approved. The inspector <br /> shall have the power, when by him deemed necessary for careful inspection <br /> of any electrical equipment to remove any construction which prevents careful <br /> inspection on his part. <br /> Upon completion of said work, it shall be the duty of the persons doing the <br /> same to notify the City Electrical Inspector within twenty-four hours after <br /> completion of said work. The Electrical Inspector shall at once proceed <br /> to inspect the same, and if said work is in all respects in conformity with <br /> the provisions of this chapter, he shall issue a certificate of final inspection, <br /> which shall contain the date of final inspection. No electrical current shall <br /> be turned on such electrical equipment, and no electrical equipment put <br /> into service until this certificate is issued. <br /> Section 12(a): ELECTRICAL WORK - INSPECTION REQUIRED <br /> If, after being notified of the completion of any electrical work or <br /> electrical equipment hereinbefore specified, the inspector shall be unable to <br /> inspect the same within a period of twenty-four hours immediately following <br /> the service of said notice of completion, the City Electrical Inspector may <br /> issue a temporary permit allowing current to be turned on such electrical <br /> equipment, pending the inspection of the work. <br /> Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.