My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Puget Sound Energy 7/24/2019
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Puget Sound Energy 7/24/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:35:08 AM
Creation date
8/1/2019 10:35:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Puget Sound Energy
Approval Date
7/24/2019
Department
Facilities
Department Project Manager
Josh O'Neil
Subject / Project Title
Installation of Natural Gas Service Fire Two
Tracking Number
0001939
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 585D5F83-9B49-4DA4-BCED-09EFDA53EF05 City <br /> PSE PUGET SOUND ENERGY <br /> Puget Sound Energy <br /> P.O.Box 97034 <br /> Bellevue,WA 98009-9734 <br /> PSE.com <br /> 7-16-19 <br /> Everett Flre Dept. <br /> 2930 Wetmore Ave <br /> Everett WA 98201 <br /> RE: Commercial Natural Gas Service Contract <br /> PSE Order No.106357374 <br /> Dear Everett Flre Dept. <br /> Thank you for choosing natural gas for your business, I have completed the site visit and cost estimate for your <br /> project at:2290 16th St Everett 98201 <br /> PROJECT INFORMATION ON ESTIMATED CHARGES AND CONDITIONS <br /> You will be receiving an email from DocuSign letting you know that you have a document requiring your <br /> signature. This document is the contract that we will need to proceed with your project. <br /> After you receive the email notice from DocuSign, please refer to the steps below to complete the <br /> agreement: <br /> 1. Review the contract to ensure accuracy and verify information captured during our telephone <br /> conversation and site meeting regarding your natural gas inquiry. <br /> 2. Please note a one-time set-up fee and monthly service fee will be charged to your account <br /> once the meter is installed, even if you have not yet started to use natural gas. These amounts <br /> are subject to change depending on current rates. <br /> 3. Sign where a signature is indicated on the contract. <br /> 4 Once you "confirm signing"on the document,we will receive your contract electronically for <br /> processing. Please save a copy of the electronic document for your records. <br /> Upon signing your contract in Docusign, you will be billed by PSE for the amount indicated on the <br /> contract. This payment needs to be received prior to scheduling your project. Please note that if there <br /> are significant changes to scope, you will be provided with a new estimate of costs based upon changes <br /> in scope. If the scope change results in a change of your initial payment, Puget Sound Energy will bill or <br /> refund you the difference, as appropriate. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.