Laserfiche WebLink
DocuSign Envelope ID:585D5F83-9649-4DA4-BCED-09EFDA53EF05 <br /> Below are the typical steps you can expect once we receive your completed contract: <br /> 1. Once we receive your natural gas service contract the process will be initiated to bring natural gas <br /> to your business. There are many possible steps involved (site inspection, traffic control plan and <br /> permitting design with the local jurisdiction, obtaining easement, and obtaining underground <br /> locates prior to the installation and schedule availability). On average,this process can take 10 to <br /> 12 weeks to complete. <br /> 2. Once the permit is secured,we will contact you to schedule your natural gas service installation. <br /> If you need assistance with finding a mechanical contractor, PSE can assist you through our Contractor <br /> Alliance Network. Our Energy Advisors are available at 1-800-562-1482 to assist you. <br /> After our crew completes the installation of your new service and meter,the gas meter will be locked. <br /> You will need to have your mechanical contractor make connection to the meter and call PSE Customer <br /> Service at 1-888-CALLPSE to have the meter unlocked. PSE Customer Service will require a copy of the <br /> signed off pressure test permit to be posted at the meter, as well as someone on site in case they need <br /> access to any of the appliances. <br /> Thank you in advance for submitting your natural gas service contract, you will soon be enjoying the <br /> many benefits of natural gas. We look forward to the opportunity to serve you. <br /> Should you have any questions along the way I am here to assist you. <br /> Sincerely, <br /> Erik Bilstad <br /> erik.bilstad@pse.com <br /> 425-213-4286 <br /> Page 2 of 2 <br />