My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2927 ROCKEFELLER AVE 2019-08-08
>
Address Records
>
ROCKEFELLER AVE
>
2927
>
2927 ROCKEFELLER AVE 2019-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2019 8:28:47 AM
Creation date
8/8/2019 8:28:45 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2927
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the County Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. Whenever inspection and/or monitoring <br /> reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the <br /> actual discharge of or potential to discharge a significant amount of any pollutant, <br /> appropriate BMPs or design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant <br /> effect on the discharge of pollutants to waters of the state. The SWPPP shall be modified <br /> if, during inspections or investigations conducted by the owner/operator, or the applicable <br /> local or state regulatory authority, it is determined that the SWPPP is ineffective in <br /> eliminating or significantly minimizing pollutants in stormwater discharges from the site. <br /> The SWPPP shall be modified as necessary to include additional or modified BMPs <br /> designed to correct problems identified. Revisions to the SWPPP shall be completed <br /> within seven days following inspection. <br /> 13: Protect On-Site Stormwater Management BMPs for Runoff from Hard Surfaces. <br /> No hard surfaces are proposed for this project at this time, thus this requirement is met. <br /> Rockefeller Building Demolition 18-0115 <br /> January 2018 �^ Pegemer <br />
The URL can be used to link to this page
Your browser does not support the video tag.