My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2927 ROCKEFELLER AVE 2019-08-08
>
Address Records
>
ROCKEFELLER AVE
>
2927
>
2927 ROCKEFELLER AVE 2019-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2019 8:28:47 AM
Creation date
8/8/2019 8:28:45 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2927
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3: Control Flow Rates <br /> This project is below the thresholds requiring flow control for the project. <br /> 4: Install Sediment Controls <br /> This site SWPPP proposes to construct/maintain a gravel entrance (BMP C105). The <br /> construction of these features should be completed before the clearing and grading of the <br /> site. Mulch (BMP C121) will also be used on the exposed soil as necessary to limit <br /> erosion. In addition, streets shall be cleaned as needed at the end of each workday or <br /> throughout the day if dirt and debris is tracked onto the paved surfaced. <br /> 5: Stabilize Soils <br /> The "Construction Sequence" calls for the stabilization of soils that remain unworked for <br /> certain lengths of time based on the time of year. Bare/disturbed soils shall remain <br /> uncovered or un-stabilized for no more than 2 days from Oct. 1 — April 30 and no more <br /> than 7 days from May 1 — Sept. 30. Stabilization techniques may include but not limited <br /> to mulching (BMP C121), plastic sheeting (BMP C123) or hydroseeding (BMP C120), <br /> notes have been added to the plan regarding protection for the stock pile area if <br /> necessary. A stockpile area has been identified on the SWPPP and is setback a minimum <br /> of 25-feet from any down slope property line. In addition, during dry periods soil should be <br /> covered or wetted (BMP C140) to reduce the production of dust. <br /> 6: Protect Slopes <br /> All disturbed slopes on site during construction are required to be protected with mulch <br /> (BMP C121) or other means.as specified in the construction sequence like surface <br /> roughening (BMP C130). No concentrated runoff or significant amounts of sheet flow will <br /> be directed to new cut or fill slopes during construction (BMP C206). <br /> 7: Protect Drain Inlets <br /> The existing catch basins adjacent to this project and immediately downstream will be <br /> protected with inlet project. All new catch basins will also be protected with inlet <br /> protection. <br /> 8: Stabilize Channels and Outlets <br /> No new channels or outlets are proposed for this site. <br /> 9: Control Pollutants <br /> No outside chemicals are expected to be necessary for the construction of this project. A <br /> drip pan or other appropriate temporary containment device shall be placed at locations <br /> where leaks or spills may occur during the fueling or maintenance of machinery. <br /> 10: Control DeWatering <br /> DeWatering is not expected for this project. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the City to relocate or add BMPs as necessary as site <br /> conditions change. BMPs should be inspected and maintained as needed after every rain <br /> event producing more than %" of rain in a 24-hour period. Also, BMPs shall be inspected <br /> on a weekly basis even if site work is not occurring. <br /> Rockefeller Building Demolition 18-0115 <br /> January 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.