Laserfiche WebLink
— Dig at 50' increments through straight portion of water main. <br /> — Dig adjacent to end of to be constructed water main to ensure allowable room for new thrust <br /> blocks to be constructed. <br /> Sewer <br /> - Confirm sanitary sewer stub elevations. <br /> Pothole locations are marked on the attached plan sheets with additional notes where necessary. As <br /> previously mentioned APS will perform additional utility locating for gas, comm, electrical and any <br /> other additional lines not located in the attached tickets. <br /> We are available to answer any questions you might have, please feel free to <br /> contact me directly at(425)420-3468. <br /> Sincerely, <br /> Patrick Carter <br /> Project Manager, Hos Bros Construction <br /> Attachments: Utility Locate Request Tickets Soundview <br /> Soundview Business Camp Sheets <br /> HOS BROS CONSTRUCTION INC. <br /> fewrf 7733 W Bostian Road,Woodinville,WA 98072 <br /> 7c)7(9 <br />