My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2420 39TH ST VERIZON WIRELESS ANTENNA 2019-08-08
>
Address Records
>
39TH ST
>
2420
>
VERIZON WIRELESS ANTENNA
>
2420 39TH ST VERIZON WIRELESS ANTENNA 2019-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2019 2:46:32 PM
Creation date
8/8/2019 2:46:29 PM
Metadata
Fields
Template:
Address Document
Street Name
39TH ST
Street Number
2420
Tenant Name
VERIZON WIRELESS ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iip. <br /> 5/05-02-1 <br /> m � <br /> Date: April 13,2018 MORRISON HERSHFIELD <br /> Mr. Michael Murray Morrison Hershfield <br /> Crown Castle 1455 Lincoln Parkway, Suite 500 <br /> 2055 S. Stearman Drive Atlanta, GA 30346 <br /> Chandler,AZ 85286 (770)379-8500 <br /> Subject: Structural Analysis Report <br /> Carrier Designation: Verizon Wireless Co-Locate <br /> Carrier Site Name: SEA Wide Stream <br /> Crown Castle Designation: Crown Castle BU Number: 815285 <br /> Crown Castle Site Name: Lowell <br /> Crown Castle JDE Job Number: 478553 <br /> Crown Castle Work Order Number: 1555836 <br /> Crown Castle Application Number: 421386 Rev.4 <br /> Engineering Firm Designation: Morrison Hershfield Project Number: CNO-965R7/1800030 <br /> Site Data: 2420 39th Street, Everett,Snohomish County,WA 98201 <br /> Latitude 47°57'56.28'; Longitude-122°11'44.25" <br /> 130 Foot—Rohn Monopole Tower <br /> Dear Mr. Murray, <br /> Morrison Hershfield is pleased to submit this "Structural Analysis Report"to determine the structural integrity <br /> of the above mentioned tower. This analysis has been performed in accordance with the Crown Castle <br /> Structural 'Statement of Work' and the terms of Crown Castle Purchase Order Number 1171570, in accordance <br /> with application 421386, revision 4. <br /> The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we <br /> have determined the tower stress level for the structure and foundation, under the following load case, to be: <br /> LC7: Existing/Reserved+Proposed Equipment Sufficient Capacity <br /> Note:See Table I and Table II for the proposed and existing/reserved loading,respectively. <br /> This analysis has been performed in accordance with the 2015 International Building Code based upon an <br /> ultimate 3-second gust wind speed of 110 mph converted to a nominal 3-second gust wind speed of 85 mph per <br /> section 1609.3.1 as required for use in the TIA-222-G Standard per Exception#5 of Section 1609.1.1. Exposure <br /> Category C with a maximum topographic factor, Kit, of 1.0 and Risk Category II were used in this analysis. The <br /> seismic design category and site class D, as determined in"Appendix D—Seismic Calculations"of this report. <br /> We at Morrison Hershfield appreciate the opportunity of providing our continuing professional services to you <br /> and Crown Castle. If you have any questions or need further assistance on this or any other projects please give <br /> us a call. <br /> Respectfully submitted by: N.* `,f,°lyy <br /> ,rte-.j' ' t‘ <br /> Shawn W. Stevenson, S.E. (WA License No.42002) ;,� = k <br /> Senior Engineer P " <br /> I J2 sem,, <br /> 4,41/4•''t RAI +0*- <br /> xpires 3/112020 <br /> tnxTower Report-version 7.0.8.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.