. ' ,:� <br /> 18-015 SPEC REV 1 90% <br /> 01 31 00-PROJECT MANAGEMENT AND COORDINATION <br /> A. GENERAL COORDINATION <br /> 1. The Contractor shall be in charge of this Contract and the Project, as well 3. Establish "hot-works" fire safety precautions required for performance of 1. Steel Framing and Furring: 2. Tensile Strength: 1,600 psi per ASTM C 307. C�. CURING, PROTECTING, AND CLEANING �• <br /> as directing and scheduling of all Work. Final responsibility for the Work. Clark Dietrich, Inc. 3. Flexural Strength: 4,000 psi per ASTM C 580. '1. Cure resinous flooring materials in compliance with manufacturer's _ <br /> performance, interface, and completion of the Project shall be the Steeler 4. Water Absorption: � 1% per ASTM C 413. directions, taking care to prevent contamination during stages of ' �:� <br /> Contractor's. G. PERFORMANCE or Approved Equal 5. Impact Resistance: > 160 in. Ibs. per ASTM D 2794. application and prior to completion of curing process. Close area of � <br /> 2. Anticipate interrelationship of all Subcontractors and their relationship with 1. Execute cutting and patching work in a manner to avoid damage to other 2. Water Resistant Gypsum Wall Board: 6. Flammability: Class 1 per ASTM E-648. application for a minimum of 18 hours. r <br /> the total Work. work; Provide proper surfaces for installation of new work; and provide a Georgia-Pacific Corp. 7. Hardness: 85 to 90, Shore D per ASTM D 2240. 2. Protect resinous flooring materials from damage and wear during <br /> 3. Resolve differences or disputes between Subcontractors and materials neat transition from existing finishes to new work. Gold Bond Building Products Div., National Gypsum Co. construction operation. Where temporary covering is required for this <br /> suppliers concerning coordination, interference, or extent of the Work. 2. Fit new work to existing pipes, sleeves, ducts, conduit and other United States Gypsum Co. G. PATCHING AND FILL MATERIAL: Resinous product of or approved by resinous purpose, comply with manufacturer's recommendations for protective <br /> Contractor's decisions, if consistent with Contract Document penetrations through surface. orApproved Equal flooring manufacturer and recommended by manufacturer for application materials and method of application. General Contractor is responsible <br /> requirements, shall be final. 3. For all new work made to existing work under warranty, employ original indicated. for protection and cleaning of surfaces after final coats. <br /> 4. Cooperation with other contractors during the term of this Project may be installer or fabricator to perform cutting and patching unless otherwise C. STEEL FRAMING FOR WALLS AND PARTITIONS 3. Cleaning: Remove temporary covering and clean resinous flooring just <br /> H. JOINT SEALANT: Type recommended or produced by resinous flooring prior to final inspection. Use cleaning materials and procedures <br /> required within the building or other adjacent locations to the construction approved by the Owner. 1. Steel Studs and Runners: ASTM C 645. manufacturer for type of service and joint condition indicated. Include allowances recommended by resinous flooring manufacturer. <br /> limits of this Project. The Contractor is to cooperate with the Owner in 4. Prepare surfaces to provide fior the specified installation of new work and 2. Depth: As indicated on Drawings for Stonflex MP7 joint fill material, and CT5 concrete crack treatment. <br /> coordination of all work to prevent impact to this or other Owner sponsored finishes. 3. Protective Coating: ASTM A 653/A 653M, G60 (Z180) hot-dip galvanized. 09 9� 23 - INTERIOR PAINTING . <br /> construction projects. 5. Remove and replace or repair unsuitable substrate materials for new 4� Flat Strap and Backing Plate: Steel sheet for blocking and bracing in <br /> length and width indicated. <br /> 5. The Contractor will cooperate with the Owner in coordination of all work to applications. I. PREPARATION A. MAN UFACTURERS: Subject to compliance with requirements, provide products <br /> 5. Cold-Rolled Channel Bridging: 0.0538-inch (1.37-mm) bare-steel <br /> avoid impacts to the Owner's operations. 6. Restore existing building systems that are impacted by cutting and 1. General: Prepare and clean substrates according to resinous flooring by one of the fiollowing: ' <br /> atchin work to ori mal o eratin conditions. thickness, with minimum 1/2-inch- (12.7-mm-) wide flanges. manufacturer's written instructions for substrate indicated. Provide clean, <br /> p g g p g 6. Clip Angle: Not less than 1-1/2 by 1-1/2 inches (38.1 by 38.1 mm), 0.068- 1. Benjamin Moore &Co., Glidden or Approved Equal. <br /> B. SPECIAL COORDINATION 7. For penetrations cut in existing fire-rated separations, completely seal new dry, and neutral Ph substrate for resinous flooring application. � <br /> inch- (1.73-mm)thick,galvanized steel. 2. Concrete Substrates: Provide sound concrete surfaces free of laitance, <br /> 1. TPie Contractor is responsible for receiving, unloading, storage and work with fire-stopping materials to full thickness of the penetrated B. VOC CONTENT: Products shall comply with VOC limits �of authorities having <br /> 7. Resilient Furring Channels: 1/2-inch- (12.7-mm-) deep, steel sheet glaze, efflorescence, curing compounds, form-release agents, dust, dirt, <br /> handling of Owner Furnished Contractor Installed (OFCI) items from the element. members designed to reduce sound transmission. jurisdiction and,for interior paints and coatings applied at Project site,the following <br /> grease, oil, and other contaminants incompatible with resinous flooring. VOC limits, exclusive of colorants added to a tint base,when calculated accordin <br /> time of receiptthrough Substantial Completion. 8. Replace existing fire-stopping materials when disturbed by new work. 9 <br /> 3. Mechanically prepare substrates as follows: to 40 CFR 59, Subpart D (EPA Method 24). <br /> 2. The Contractor is responsible for protecting OFCI and Owner Existing 9. Remove debris and abandoned items from the work area, including from D. GYPSUM WALL BOARD: Provide gypsum board in maximum lengths available Shot-blast surfaces with an apparatus that abrades the concrete surface, 1. Flat Paints and Coatings: 50 g/L. <br /> Contractor Installed (OECI) items from damage, such as: damage from concealed spaces. to minimize end joints. Thickness, 5/8 inch unless otherwise indicated. ASTM C contains the dispensed shot within the apparatus, and recirculates the shot 2. Non-flat Paints and Coatings: 150 g/L. <br /> exposure to the elements; or from damage to a warranty due to 36, tapered edges. Type X. b vacuum icku Com I with ASTM C 811 <br /> Contractor's im ro er installation and testin The costs to re air or 02 41 00 - SELECTIVE DEMOLITION y p p' p y 3. Anticorrosive and Antirust Paints Applied to Ferrous Metals: 250 g/L. <br /> P P 9• P 4. Repair damaged and deteriorated concrete according to resinous flooring 4. Zinc-Rich Industrial Maintenance Primers: 340 g/L. <br /> t-eplace items damaged while in the Contractor's possession shall be E. TRIM ACCESSORIES: ASTM C 840, Manufacturer's standard trim accessories, manufacturer's written recommendations. <br /> borne b the Contractor. A. GENERAL including corner bead and edge trim of beaded type with face flanges for y y C. PRIMERS/SEALERS � <br /> y 5. Verif that concrete substrates are dr . <br /> 3. The Contractor shall consult with the Owner to determine the warranty 1. Contractor is responsible for determining scope and extent of demolition concealment in joint compound except where semi-finishing or exposed type is a. Perform in situ probe test, ASTM F 2170. Proceed with application 1. Primer Sealer, Interior, Institutional Low Odor/VOC, Water based. - <br /> requirements of OFCI and OECI items. in order to allow for installation of the work shown on the Drawings. indicated. Provide corner bead formed from zinc alloy. only after substrates do not exceed a maximum potential 2. Metal Primer, Water based. . <br /> a. Coordinate with work of other Contractors. Specific demolition notes are indicated on the Drawings that are in addition equilibrium relative humidity of 75 percent. <br /> F. GYPSUM BOARD JOINT TREATMENT y D. INTERIOR PAINTS <br /> b. Coordinate with building occupants. to the Contractor's required scope to accommodate the new work. b. Perform anh drous calcium chloride test, ASTM F 1869. Proceed r <br /> 1. Materials: ASTM C 475 and ASTM C 840, complying with with a lication onl after substrates have maximum moisture- <br /> c. Coordinate with Owner's environmental services staff. 2. Contractor is warned that there may be unknown alterations and PP Y 1. Gypsum Drywall System, (Walls and Ceilings): Latex Satin Finish: Two <br /> d. Coordination with Owner's security services. unforeseen or unknown conditions above existing ceilings,behind existing recommendations of Manufacturer of both gypsum board and joint vapor-emission rate of 3 Ib. of water/1000 sq. ft. of slab in 24 hours. finish coats over primer. Total dry film thickness not less than 5.0 mils. <br /> treatment materials for application indicated. c. Perform additional moisture tests recommended by manufacturer. 2. G sum Dir wall S stem, Walls and Ceilin s where noted in Drawin s <br /> wall furring, below concrete floor slabs, and within existing walls, and Yp Y Y t 9 9 )� <br /> 2. Finish: Level 4. Proceed with application on[y after substrates pass testing. Latex Semi-Gloss Finish: Two finish coats over rimer, with total dr film <br /> C. MECHANICAL AND ELECTRICAL COORDINATION partitions. p Y <br /> 1. Resolve all tight or restricted conditions involving work of various sections 3. Refer to Mechanical and Electrical drawings and specifications for 6. Verify that concrete substrates have neutral Ph and that resinous flooring thickness not less than 5.0 mils. <br /> in advance of installation. Coordinate the Work of all trades to ensure that additional requirements. 09 50 00 - ACOUSTICAL PANEL CEILINGS will adhere to them. Perform tests recommended by manufacturer. 3. Ferrous Metal, Semi-Gloss Finish: Two finish coats over primer,with total <br /> all fixtures, devices, switches, outlets, ducts, pipes, and similar items can 4. Demolition work includes protection of existing construction to remain, as Proceed with application only after substrates pass testing. dry film thickness not less than 5.0 mils. <br /> A. STANDARD: ASTM E 1264 for Class A materials. Ceiling Suspension Systems: <br /> be installed as shown. well as removal and disposal of demolished materials. ASTM C 635. J. RESINOUS MATERIALS: Mix components and prepare materials according to E. EXAMINATION: Examine substrates and conditions, with Applicator present, for <br /> 5. Salvage: Owner will mark and retain salvageable items as determined resinous flooring manufacturer's written instructions. compliance with requirements for maximum moisture content and other conditions �� <br /> D. JOB SITE FIELD MEASUREMENTS AND TEMPLATES with the Contractor. B. ATTACHMENT DEVICES FOR SUSPENSION SYSTEM 1. Use patching and fill material to fill holes and depressions in affecting performance of the Work. _ <br /> 1. Obtain field measurements required for accurate fabrication and 1. Anchors and intermediate support members: Provide sizes capable of substrates according to manufacturer's written instructions. 1. Maximum Moisture Content of Substrates: When measured with an <br /> installation of work included in the Contract Documents. Exact A. Requirements of Regulatory Agencies: Comply with applicable requirements of sustaining 5 times the load-carrying capabilities shown in ASTM C 635, 2. Treat control joints and other nonmoving substrate cracks to prevent electronic moisture meter as follows: ' <br /> measurements are the Contractor's responsibility. Furnish or obtain rules, regulations, laws, ordinances of governing authorities. Table 1, "Direct Hung" column. cracks from reflecting through resinous flooring according to a. Concrete: 12 percent. <br /> templates, patterns, and setting instructions as required for installation of 2. Deck inserts and hanger clips: Fabricate from hot-dip galvanized steel. manufacturer's written recommendations. Allowances should be included b. Masonry (Clay and CMU): 12 percent. <br /> all work. Verify in field. B. PROJECT CONDITIONS: Owner will be continuously occupy the building Hanger wire: Zinc-coated (galvanized) carbon steel wire, ASTM A 641, for Stonflex MP7 joint fill material. c. Wood: 15 percent. <br /> immediately adjacent to areas of selective demolition. Conduct demolition work in d. Gypsum Board: 12 percent. <br /> soft temper, with Class 1 coating, minimum 12 gauge (0.106 inch <br /> E. RECORD DRAWINGS: Maintain black line prints of the bid set Contract Drawings a manner that will not disrupt Owner's operations. diameter). M. APPLICATION: Apply components of resinous flooring system according to 2. Gypsum Board Substrates: Verify that finishing compound is sanded ' <br /> and approved Shop Drawings. Mark the drawings to show new information that manufacturer s written instructions to produce a uniform, monolithic wearing smooth. <br /> was not shown on the bid set Drawin s, and on the a roved Sho Drawin s, C. EXISTING BUILDING EXITS: Contractor's materials and activities shall not block surface of thickness indicated. 3. Plaster Substrates: Verify that plaster is fully cured. <br /> 9 PP P 9 C. Acoustical Ceiling Tile: Armstrong "Ceramaguard 605; Square lay-in, 15/16 in.; 1. Coordinate a lication of com onents to rovide o timum adhesion of 4. Verif <br /> including the actual installation where the installation varies substantively from the any exit or impair floor-to-floor separation while the building is occupied. 24 x 48x 5/8 in; 40 CAC, or approved equal. pp p p p y suitability of substrates, including surface conditions and <br /> resinous flooring system to substrate, and optimum intercoat adhesion. compatibility with existing finishes and primers. Proceed with coating <br /> work as originally shown. Mark drawings to show conditions fully and accurately. a lication onl after unsatisfactor conditions have been corrected. <br /> Where Sho Drawin s are used, record a cross-reference at the corres ondin D. PARTIAL REMOVAL: Items ofsalvaged value to Contractormay be removedfrom PP Y Y <br /> p g p g structure as work progresses. Salvaged items must be transported from site as D. Grid, Edge Moldings and Trim: Existing to remain. 2. Cure resinous floorin com onents accordin to manufacturer's written Application of coating indicates acceptance of surfaces and conditions. , <br /> location on the Drawings. Give particular attention to concealed elements that will the are removed. Stora e of removed items on site will not be ermitted. g p g # <br /> be difficult to measure and record at a later date. y g p 09 67 23 - RESINOUS FLOORING instructions. Prevent contamination during application and curing F. PREPARATION: Remove hardware, covers, plates, and similar items already in <br /> processes. <br /> lace that are removable and are not to be ainted. If removal is im ractical or <br /> E. FIRE PR07ECTION: All practical measures shall be taken to ensure fire 3. At substrate expansion and isolation joints, provide joint in resinous p p p <br /> 01 773 29- CUTTING AND PATChIING protection during all phases of the work. This shall include expediting construction A. SUBMITTALS: Furnish samples of the proposed flooring system indicating flooring to comply with resinous flooring manufacturer's written impossible because of size or weight of item, provide surface-applied protection <br /> of fire division walls, tem orar cross hallwa fire sto at the division walls, and aggregate color, broadcast media texture color, gloss, finish and sealer. Provide before surface preparation and painting. Clean substrates of substances that = <br /> p y Y p recommendations. <br /> A. CONTRACTOR RESPONSIBILITY securin the buildin from unauti�orized entr . No flammable li uids, (2) samples for each of (3) three options of broadcast media slip resistance, wet � could impair bond of paints, including dust,dirt,oil, grease,and incompatible paints <br /> 9 9 Y q a. Apply joint sealant to comply with manufacturer s written <br /> The Contractor shall bear all cost of correcting damaged or destroyed work, indicated to welding/cutting equipment, or compressed gases shall be used, except under coefficient of friction: .65, .75, .85 per ANSI B101.1. Review and selection by recommendations. and encapsulants. <br /> remain on the Contract Documents, which is caused from failure to comply with the specific approval from the Owner. Owner prior to beginning the Work. b. Apply primer where required by resinous system, over prepared ' <br /> requirements of the Contract Documents or failure to exercise reasonable care by the substrate at manufacturer's recommended spreading rate. G. APPLICATION <br /> Contractor and/or the Subcontractors'work. F. PROTECTION B. ACCEPTABLE MANUFACTURERS: Stonhard, Basis of Design. c. Integral Cove Base: Stonshield cove mortar, apply cove base mix 1. Paint all exposed conduit, mechanical ductwork and fire sprinkler piping. <br /> 1. Provide temporary barricades and other forms of protection as required to to wall surfaces before applying flooring. Apply according to 2. Do not paint fire sprinkler heads. <br /> B. SUBMITTALS: Submit written request two (2) weeks in advance of cutting or protect Owner's personnel and general public from injury due to selective C• PRODUCTS: Stonhard, Inc.; Stonstiield SLT. manufacturer's written instructions and details including those for 3. Do not paint over labels of independent testing agencies or equipment <br /> alteration which affects: demolition. taping, mixing, priming, troweling, sanding, of cove base. Round name, identification, performance rating, or nomenclature plates. <br /> 'I. Structural integrity of any element of the Project; 2. Provide protective measures as required to ensure free and safe passage D. SYSTEM CHARACTERISTICS: internal and external corners. � <br /> 2. Inte rit of weather-ex osed or moisture-resistant elements; 1. Color and Pattern: Choose from Mfg. Standards 4. A I rimer where re uired b resinous s stem, over re ared substrate H. CLEANING AND PROTECTION <br /> 9 Y p of Owner's personnel and general public to and from occupied portions of pp y p a y y p p 1. At end of each workda remove rubbish, em t cans, ra s, and other <br /> 3. Efficienc , maintenance, or safet of an o erational element; 2. Wearing Surface: As approved by Owner. at manufacturer's recommended s readin rate. y� p y g <br /> Y Y Y P the building. p g <br /> 4. Visual qualities of sight exposed elements; and 3. Integral Cove Base: 6 inches. 5. Broadcast: Immediately broadcast quartz silica aggregate into the discarded materials from Project site. , <br /> 3. Protect from damage existing finish work that is to remain in place and 4. Overall S stem Thickness: nominal 2mm. � 2. After com letin aint a lication, clean s attered surfaces. Remove �_; . <br /> 5. Work of Owner or separate contractor. becomes ex osed durin demolition o erations. y undercoat using manufacturer s specially designed spray caster. Strictly p g p pp p <br /> p 9 p s attered aints b washin scra in or other methods. Do not scratch ' '�,` <br /> adhere to manufacturer's installation procedures and coverage rates. p p y g� p g� _ <br /> 4. Protect floors with suitable coverings when necessary. E. SYSTEM COMPONENTS: Manufacturer's standard components that are 6. Undercoat: Remove an surface irre ularities b li htl abradin and or damage adjacent finished surfaces. <br /> C. VISUAL MATCHING: When indicated to"match existing," submit products and/or Y 9 Y 9 Y 9 <br /> finishes to match existing adjacent finishes for Owner's review and approval or, for 5. Construct temporary dust proof partitions to separate areas where noisy compatible with each other and as follows: vacuuming the floor surface. Mix and apply undercoat with strict 3. Protect work of other trades against damage from paint application. <br /> or extensive dirt or dust operations are performed. Equip partitions with 1. Primer: adherence to manufacturer's installation rocedures and covera e rates. Correct damage to work of other trades by cleaning, repairing, replacing, <br /> patching new work, use the specified materials and finishes in the Contract p g and refinishin as a roved b Owner, and leave in an undama ed <br /> Documents. dust proof doors and security locks, if required. a. Material Basis: Stonhard Standard Primer 7. Broadcast: Immediately broadcast quartz silica aggregate into the g� pp y g <br /> 6. Remove protections at completion of work and restore effected finishes. b. Resin: Epoxy undercoat using manufacturer's specially designed spray caster. Strict condition. <br /> D. PATCHING AND EXTENDING WORK: Provide products specified in the Contract 7. Promptly repair damages caused to adjacent facilities by demolition work c. Formulation Description: (2) two component, 100 percent solids. adherence to manufacturer's installation procedures and coverage rates 4. At completion of construction activities of other trades, touch up and <br /> at no cost to Owner. d. Application Method: Squeegee and roller. is imperative. restore damaged or defaced painted surfaces. <br /> Documents and/or match existing products with an alternate product of the most e. Number of Coats: 1 one. 8. A I to coat s in number of coats indicated for floorin s stem and at <br /> suitable grade for the intended purpose. The Contractor shall determine the type � � � PP Y P � ) � 9 Y <br /> and quality of existing products and finishes by inspection and/or testing, where I. UTILITY SERVICES: Maintain existing utilities indicated to remain, keep in 2. Broadcast Media: spreading rates to match Owner's approved sample. <br /> necessary. service,and protectagainstdamageduring demolition operations. Do not interrupt a• Material Basis: Stonshield quartz aggregate. � <br /> existing utilities serving occupied or used facilities, except when authorized in b. Type: pigmented. N. TERMINATIONS - <br /> E. EXAMINATION: Prior to commencin work the Contractor shall ins ect existin c. Finish: as approved Owner. 1. Chase edges to "lock" the flooring system into the concrete substrate - �. <br /> 9 p 9 writing by authorities having jurisdiction and the Owner. Provide temporary d. Number of Coats: one. <br /> conditions to ascertain elements subject to damage or movement and to determine services during interruptions to existing utilities, as acceptable to governing along lines of termination. y.. <br /> e. Pattern: Tweed. 2. Penetration Treatment: La and seal resinous s stem onto the erimeter <br /> the need for temporary bracing during cutting and patching work. Verify that authorities. p y p ' <br /> materials to be worked-on or removed have been evaluated in the Owner's 3. Undercoat: of the penetrating item by bridging over compatible elastomer at the <br /> a. Material Basis: Stonshield undercoat. interface to compensate for possible movement. <br /> Regulated Materials "Good Faith" Survey report. J. REMOVALS: Remove debris, rubbish and other materials resulting from b. Resin: Epoxy 3. Treat floor drains b chasin the floorin s stem to lock in lace at oint <br /> 1. Beginning of cutting or patching means acceptance of existing conditions. o Y 9 9 Y P P . <br /> 2. After cutting and/or removing existing work the Contractor shall inspect demolition operations from building on a daily basis. Transport and legally dispose c. Formulation: Two-component, 100/o solids, UV Stable. of termination. ,. <br /> conditions affecting performance of new work and notify Owner of any of material off-site. d. Type: Clear. <br /> e. Finish: Gloss. O. JOINTS AND CRACKS <br /> unforeseen physical conditions and verify that demolition is complete and 09 20 00 - GYPSUM BOARD SYSTEMS f. Number of Coats: one. 1. Treat control joints to bridge potential cracks and to maintain monolithic <br /> areas are ready for installation of new work. 4. Sealer: protection. <br /> A. QUALITY ASSURANCE a. Material Basis: Stonshield Sealer. 2. Treat cold joints and construction joints to bridge potential cracks and to <br /> F. PREPARATION 1. Perform work in accordance with GA 216- Standard Specifications for the b. Resin: Epoxy maintain monolithic protection on horizontal and vertical surfaces as well . <br /> 1. Move, or remove, items as necessary for access to cutting and patching Application and Finishing of Gypsum Board, published by the Gypsum c. Formulation: (2) two-component, 100% solids, UV Stable. as horizontal and vertical interfaces. <br /> work. Schedule shut-downs and obtain permits required for performance Association. d. Type: Clear. 3. Discontinue floor coating system at vertical and horizontal contraction and <br /> of the Work. e. Finish: Gloss. expansion joints by installing backer rod and compatible sealant after ' <br /> 2. Provide tem orar su orts to ensure structural inte rit of the Work. f. Number of Coats: one. coatin installation is com leted. Provide sealant t e recommended b <br /> p y pp g y 2. Fire rating requirements take precedence over construction requirements g p yp y ; <br /> g. Texture level: As approved by OWmer. manufacturer for traffic conditions and chemical exposures to be <br /> indicated. In event of conflict, notify Owner and do not proceed in area of encountered. <br /> conflict until resolved. F. SYSTEM PHYSICAL PROPERTIES: Provide resinous flooring system with the <br /> following minimum physical property requirements when tested according to test P. FIELD QUALITY CONTROL: Owner may at any time and any numbers of times ' <br /> B. MANUFACTURERS: Subject to compliance with requirements, provide steel methods indicated: during resinous flooring application require material samples for testing for <br /> framing, gypsum board and related products by one of the listed Manufacturers. 1. Compressive Strength: 9,000 psi after 7 days per ASTM C 579. compliance with requirements. <br /> �; <br /> � W5741115 ' <br /> �°1O �� PHASE 1 RENOVATION PACKAGE <br /> arcnitecture � Interiors <br /> ,SZofa�,tha�e IFC SUBMITTAL <br /> S'�'te 4°° � 07.02.18 � <br /> seattle,wa <br /> 98101 <br /> 206 db7 6306 <br /> buffalodesign.com # " <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY DRAWN DATE I SUBTITLE CURRENT REVISION SYMBOL DATE , <br /> 3973 REGISTERED THIS DESIGN AND OR CHECKED <br /> TECHNICAL SPECIFICATI�NS W5741115 0 R G o�.02.� 8 <br /> ORIG RESTROOM RENOVATION W5741115 BUFFALO 07,02.18 ARCHITECT SPECIr�iICA�ION IaS 'APP�E�O ' ' I _ _ SHEET <br /> � APPROVED BY I DEPT. DATE I ---� TITLE WORKPLACE ENVIRONMENT INVESTMENT <br /> ` ����� � � <br /> C/�a%aG�_�- CHEC � <br /> CHRiS EDWAADCaRLSOD! �U I LD I N� 40�023 40�030 40�037 <br /> STAT_OF WASHINGTON APPROVED > > JOB N0. COMP N0. <br /> W5741115 <br /> I ( IAPPROVED ARCHITECTURAL MASTER EVERETT, Wq °wc No. G3 <br />