My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2328 103RD ST SW 2019-08-20
>
Address Records
>
103RD ST SW
>
2328
>
2328 103RD ST SW 2019-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 8:15:06 AM
Creation date
8/20/2019 8:15:04 AM
Metadata
Fields
Template:
Address Document
Street Name
103RD ST SW
Street Number
2328
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> On Nov 13, 2017, at 10:47 AM, David Tyler<DTyler@everettwa.gov>wrote: <br /> Ken/John- <br /> Thank you for providing the restoration plan and for meeting with me on-site last week. The restoration <br /> plan is approved, subject to the following: <br /> 1. Wetland restoration shall be performed by removing fill,grading and planting of native wetland plants <br /> in accordance with the Critical Areas Study and Mitigation Plan dated October 30, 2017 (mitigation <br /> plan). <br /> 2. Following the removal of fill within the wetland/buffer areas,the on-site soils must be evaluated for <br /> their suitability to support native wetland and buffer plants. If necessary, additional topsoil must be <br /> provided as set forth in the mitigation plan. <br /> 3. The interim stream and wetland buffer on the north and east sides of the stream shall be a minimum of <br /> 30 feet at this time. This area shall be planted with native vegetation per the planting schedule provided <br /> in the restoration plan. This shall be an interim buffer necessary to prevent erosion, sedimentation and <br /> water quality problems within the stream and wetland areas. A permanent buffer will be established at <br /> such time as a formal land use application is submitted and approved for the property. It is noted that a <br /> reasonable use application will be the appropriate application process, since the standard wetland and <br /> stream buffers would most likely render the property undevelopable (see Option 3 graphic exhibit in the <br /> mitigation plan). <br /> 4. Fencing—A construction fence or other temporary fence shall be installed along the edge of the 30' <br /> buffer. <br /> 5. Removal of Vehicles from site. Please note the temporary use permit to allow truck parking on the site <br /> has expired and the trucks must be removed from the site. <br /> 6. Public Works Permit—Per the Violations Hearing Examiner Order dated 8/31/17, an application for <br /> Public Work permit shall be submitted no later than November 28,2017. Please contact the Public <br /> Works/Permit Services Department at 425-257-8810 for more information on submittal requirements. <br /> 7. Performance Bond—A performance bond in the amount of 300%of the value of restoration work <br /> (materials and labor) at the time of Public Works permit issuance. <br /> 8. Timing of Restoration Work-The City will not impose seasonable limitations on restoration work since <br /> the project involves correcting a violation and will reduce water quality impacts on Swamp <br /> Creek. Restoration work shall be completed by December 29,2017. <br /> If you have any questions please feel free to contact me. <br /> Sincerely, <br /> David Tyler, Planner <br /> City of Everett Planning/Community Development Dept. <br /> 2930 Wetmore Ave.,Suite 8A <br /> Everett, WA 98201 <br /> 425-257-7164 <br />
The URL can be used to link to this page
Your browser does not support the video tag.