more analysis of these impacts is required, then that supplemental work will be done under <br /> an additional scope and budget. <br /> • The proposed utility bridge does not include in-water work. <br /> • The pedestrian bridge phase of the project will be included in the BA, but does not require <br /> any additional analysis. <br /> • Design and construction details required for permit applications that are not directly related <br /> to a critical areas determination will be provided to the Landau Associates biologist. Such <br /> elements include, but are not limited to, stormwater drainage report; temporary sediment <br /> and erosion control plan; proposed construction timing, sequencing and duration; and <br /> primary types of construction equipment to be used. <br /> • This task does not include efforts to perform 6-month update review(s) of species listings or <br /> reevaluation of project impacts following agency concurrence on the Biological Assessment. <br /> Should update review of species listings and impacts be required, an addendum to this <br /> scope and budget can be prepared. <br /> • The budget and scope does not include monitoring of any federally listed or state listed <br /> species during construction activities. Should any monitoring of these species be required, <br /> an addendum to this scope and budget can be prepared. <br /> • Results of site reconnaissance will also be incorporated into SEPA Checklist (Task 5.11) <br /> and JARPA (Task 24.16) as appropriate. <br /> • No wetland habitats exist in the project area. <br /> • Species listings acquired as part of Task 24.14 overlap the utility bridge project segment. <br /> • A single BA will be prepared under Task 24.14. <br /> Deliverables <br /> • Refer to Task 24.14 <br /> 12.16 — Cultural Resources Investigation <br /> Landau Associates shall obtain the services of Equinox Research and Consulting International <br /> (ERCI) to identifying cultural resources in the project corridor for anticipated compliance with <br /> Section 106 of the National Historic Preservation Act (NHPA). ERCI and Landau Associates <br /> shall support the project with: <br /> • Records review <br /> • Develop Area of Potential Effects, and initial consultation letter for use by WSDOT for <br /> purposes of consultation with the Washington Department of Archaeology and Historic <br /> Preservation (DAHP) and affected tribe(s) <br /> • Field investigation, including shovel probes and monitoring of geotechnical explorations <br /> • Reporting <br /> • Preparation of Inadvertent Discovery Plan <br /> • Agency coordination in support of WSDOT consultation with DAHP and affected tribe(s). <br /> Landau Associates shall assist in preparation of the APE, provide review of ERCI documents, <br /> and produce hardcopies of ERCI reports. <br /> Assumptions <br /> • WSDOT will submit the APE letter to DAHP and the affected tribe(s) for their respective <br /> reviews and concurrence. <br /> • Site access will be reasonable and unrestricted. <br /> • The Consultant's archaeologist will be required to monitor no more than 3 geotechnical <br /> borings within the project area over the course of two 8-hour days. <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Utility Bridge, Phase 1A Page 37 of 55 <br />