Laserfiche WebLink
EXHIBIT D <br /> KPFF Consulting Engineers <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE, <br /> Classification Total Hours X Rate = Cost <br /> Principal /Tech. Specialist 360.00 X $62.50 = $22,500.00 <br /> Project Manager 1109.00 X $54.60 = $60,551.40 <br /> Senior Engineer 1140.00 X $45.00 = $51,300.00 <br /> Design Engineer 1013.00 X $35.40 = $35,860.20 <br /> CADD Technician 1553.00 X $39.23 = $60,924.19 <br /> Coordinator/Admin 191.00 X $28.85 = $5,510.35 <br /> Land Survey Manager 91.00 X $40.39 = $3,675.49 <br /> Project Surveyor 115.00 X $32.00 = $3,680.00 <br /> Survey Field Crew 166.00 X $50.00 = $8,300.00 <br /> Survey Drafter 95.00 X $20.00 = $1,900.00 <br /> DSC Subtotal $254,201.63 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 136.59% X $254,201.63 = $347,214.01 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $254,201.63 = $76,260.49 <br /> Reimbursables <br /> Mileage (## Miles x $0,565/mile) �' <br /> Utility Pothole Contractor APS $8,600.00 <br /> Bathymetry Terrasond $4,600.00 <br /> Utility Contractor Mt. View Locating 44, $5,280.00 <br /> 3D Laser Scanner Alt Task PPI/KPFF $5,000.00 <br /> Subtotal $23,480.00 <br /> Subconsultant Costs (See Exhibit G) $948,809.75 <br /> Management Reserve $100,000.00 <br /> GRAND TOTAL: $1,749,965.87 <br /> Date: 11/20/2014 <br />