Laserfiche WebLink
Hour Summary KPFF Consulting Engineers <br /> • COST ESTIMATE: GRAND AVENUE PARK BRIDGE <br /> November 20,2014 HWA GeoSciences Inc. HWA <br /> Geotech Geotech Geotech l Hydro <br /> GRAND AVENUE PARK BRIDGE Prncple Prin nca nlcal nice) Gedogist > <br /> IX VIII Eng neerEngineer Engineer' V edcfeai Gedegiat I CAD Clerical <br /> VI IV I IV <br /> J{ MULTIPLIER: <br /> Item SCOPE OF WORK $72.00 $72.00 $48.08 $45.67 $25.48. $31 39 $34.62 $23.32 $22.07 I $20.82 3.0500 <br /> PHASE 1B - PEDESTRIAN UPGRADES <br /> 13 PROJECT MANAGEMENT&ADMINISTRATION(KPFF&LMN) <br /> Labor Subtotal: 0 0 0 0 I 0 0 0 0 0 0 $0 <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 0 0 $0 <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 0 0 $0 <br /> . �, ,:;;"-de", <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 0 0 $0 <br /> 1 L <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 0 0 So <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 0 0 $0 <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 0 0 $0 <br /> Reimbursables: <br /> Labor Subtotal: 0 0 0 0 0 0.... 0 0 0 0 so <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 0 0 $0 <br /> Reimbursables: <br /> Pedestrian Bridge Labor Sum: 0 00000000 0 $0 <br /> Pedestrian Brid•e Reimbursable Sum: $0 <br /> Pedestrian Bridge Subtotal: ,d <br /> Phase 1 Labor Sum(Utility&Pedestrian Bridge): 10 14 20 317 304 56 16 2 10 8 $84 359 <br /> Phase 1 Reimbursable Sum(Utility&Pedestrian Bridge) ,,,111M141(E111 <br /> PHASE 1 SUBTOTAL: $130,959 <br /> Date:11/19/2014 Page 2 of 3 <br />