My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hour Summary KPFF Consulting Engineers <br /> COST ESTIMATE: GRAND AVENUE PARK BRIDGE ' <br /> November 20,2014 HWA GeoSciences Inc. INZ21.1111 <br /> Geotech Geotech Geotech • <br /> Hydro <br /> GRAND AVENUE PARK BRIDGE Principle'Principle ni.1 nicai nical Geologist <br /> IX VIII Engineer Engineer:Engineerl V - -'st Geologist U CAD Clerical <br /> VI IV I ' IV MULTIPLIER' <br /> Item SCOPE OF WORK $72.00 $72.00 $48.08 $45.67 $25.48 $31.39r ®r 3.0500 <br /> PHASE 2 — WEST MARINE VIEW DRIVE UTILITIES <br /> 22 OP.°71`HIC• -. ND•- •UR 'FF <br /> Labor Subtotal: 0 IIIILMIIIIIMIM1111111111113111111C1111111MEIMMM 0 <br /> Reimbursables- <br /> FM Prelimina Geotechnical En•ineerin•Field •'orations <br /> ® Review Available Geotechnical and Geol..ic Data IMIIIMIN00-_-- EIMEMINIE <br /> - <br /> ERE' Plan Field Ex,knation P..,-m IMMEIEMEGICENNIM <br /> MIEBIlliMEM® Generate Field Ex•loration Memo ®0©----- <br /> Ma Conduct Subsurface Ex.lorations 2 Ten Hour Da s IIIIIIIIMIIMMIIIIIIMIIIMIIIIIIIIIIIM111111111111111111CM111111® Generate Bonn.L.•s and Assi.n Lab Testi. -- - <br /> • Evaluate Field and Laborat. Data w0-©- -- <br /> ®Prelimina Geotechnical En•ineerin•Ana sis <br /> ® Develo.Utili Trench and Dewatenn.Recommendations 2 EIMIME. MIEM=IIIIIIBCAEIIIIIIII <br /> ® Generate Prelimina Geotechnical Re..n 1 ---- 51.117231111. <br /> - <br /> ®Prelimina Geotechnical En•ineerin•Environmental Su••ort <br /> ® Corn.ete Groundwater Monifonn, 4 Four Hour Site VisitsIMMIIMNIMMINIMEMEMEIMINI--IllaS=BION <br /> ® Generate Draft/Final Geo•• and Soils Disci..ine Re.. 2 MIIIIIMIIEIIIIMBIIIIEIOIIIIIIIIIIMIIIIIIIIIMIIIMMIIIMIIIIIIMMIIIIIIIIIVEDIMIIIIIIIII <br /> IIMI Prelimina Geotechnical En•ineerin•Task Mana•ement <br /> • Attend P•'act Coordination Meetin.s 2 Meeti.sat Three Hours Each --_-MINNIMMIEll <br /> Eiji Task Mane.:ment 1111MIINNERMIN <br /> MINMIIIIIIMINIIIIMIll®Final Geotechnical En•ineerin•Desi•n <br /> ® Final Desi.n E.ineerin•Ana sis -_ --- IIIIIZEIIIII <br /> - <br /> ® Final Geotechnical Re•• M:MMiElIMEINIIIIIIIIMIIIIIMIINIIIIIICIIIMIEIOIEIIII <br /> ® Res.. •,. .., n": R-:r•R:vi= •mm=nt" -_--11111111121111111111111 <br /> Emi Attend Pro ct Coordination Meeti.s 2 Meeti.sat Three Hours Each MOMMIMIIIIIM=IMMIIIIMMINIIIMIMMIE <br /> ® Geotechnical Plan and S•ecification Review IMIEMIIEIIIIEMMIIIIIIIIIMOI=IIIIIIIIIIIMIIIIIIIIIIIIIIOIEIEIIIIIIIIII• Res.. d to Geotechnical Related Pre-Bid Questions -- ---- <br /> ® Task Mane.,ment -- r -_-- <br /> lEITIA•d,• .I r: i.IFi-L 44:1•1,uI.:. IimaSot,G - <br /> Ego Conduct Subsurface Ex.!orations 1 Ten Hour Da __01MIIIMM-_-_ <br /> ® WSDOT Coordination for Field Ex•lorationsMIIIMIMMIEM=MIMII.I.M.IIIMMMIEMMMM <br /> EEICEIII♦C ana.atait.,•nr. :.L.t..tan..•issxrnnakn.Icrvi . - ----MIIIIIEMEIIIMI <br /> Elm Additional Evaluation of Field and Laborato Data --_IIMINIE1111111---- <br /> ELIMI Evaluate Soils for '•uefaction and Lateral S.readin.Potential --MIMIIIEMIIIMIIIMIIIIIMIMMMIIIIIIIIIMIIOII <br /> Ego Develo.Utif Trenchin.,Tem.•: Shod.and Dewaten.Recommendations 2 © Om--__- <br /> F ��M:!MMil7MINNEM1171MIIMIIIIMINIUMNIIIMII <br /> oNIEIM®moo <br /> Reimbursables: <br /> Labor Subtotal: 0 000000000 <br /> Reimbursables: <br /> 0000001000 0 <br /> Reimbursables: MIIIIIIIIONIIMIIIIII <br /> ". �..<_ as-•,. .. ., -. <br /> 000000000 0 <br /> Reimbursables: <br /> 000000000 0 <br /> Reimbursables: <br /> Phase 2-Utilities North of Brid.a Labor Sum: 11 OM® r r DOOM© <br /> Phase 2-Utilities North of Brid•e Reimbursable Sum: <br /> Phase 2-Utilities North of Bridge Subtotal: HWA UTILITITES N.OF BRIDGE SUBTOTAL: $51,010 <br /> Labor Sum(Phases 1 and 2): 21 20 30 430 404 1 94 24 10 24 11 $119,255 <br /> Reimbursable Sum(Phases 1 AND 2): $62,714 <br /> TOTAL (PHASES 1 AND 2): , ,,, ,:,HWA TOTAL(UTILITY&PEDESTRIAN): ,-,411)ESIV, <br /> s, <br /> Date:11/19/2014 Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.