My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith 8/15/2019 Amendment 4
>
Contracts
>
6 Years Then Destroy
>
2019
>
Murraysmith 8/15/2019 Amendment 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 10:42:48 AM
Creation date
8/22/2019 10:42:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith
Approval Date
8/15/2019
Council Approval Date
8/7/2019
End Date
12/31/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Post Construction Support Operations Manual
Public Works WO Number
UP3620
Amendment/Change Order
Amendment
Amendment/Change Order Number
4
Total Compensation
$47,603.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assumptions <br /> 1. iCon Golf's involvement will be defined as the need arises based on authorization by the <br /> City up to the extent of the budget for this subtask. <br /> 2. Two (2) meetings are anticipated in the development and review of the draft Manual and <br /> associated hydraulic modeling. <br /> 3. Historic long-term, continuous rainfall, pond levels, and flow data will be provided by the <br /> City, if available. <br /> 4. The most recent InfoSWMM model delivered to the City is current and contains no changes <br /> that would otherwise require Murraysmith to request an updated version of the model <br /> from the City. <br /> 5. Preliminary model results will be provided to the City, via email, followed by a conference <br /> call to discuss as needed. <br /> Task Deliverables <br /> 1. Preliminary model results to review with the City, via email <br /> 2. A draft Manual in electronic pdf format for review by Utilities and Parks. <br /> 3. Five (5) hard copies and one electronic copy of the final Manual. <br /> City of Everett MURRAYSMITH Legion Golf Stormwater <br /> July 2019 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.