My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith 8/15/2019 Amendment 4
>
Contracts
>
6 Years Then Destroy
>
2019
>
Murraysmith 8/15/2019 Amendment 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 10:42:48 AM
Creation date
8/22/2019 10:42:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith
Approval Date
8/15/2019
Council Approval Date
8/7/2019
End Date
12/31/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Post Construction Support Operations Manual
Public Works WO Number
UP3620
Amendment/Change Order
Amendment
Amendment/Change Order Number
4
Total Compensation
$47,603.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15.3 Pond System Operations and Control Manual <br /> Develop a Pond Operations and Control Manual (Manual) for use by the City in the operation of <br /> the stormwater improvements, including the control structures and valving. The operational <br /> narrative will briefly address maintenance items, taking into consideration the golf course aspect <br /> of maintenance needs. The narrative will be developed as an operation and maintenance manual <br /> with the follow elements: <br /> ■ Project goals. <br /> ■ Drainage area and system overview. <br /> ■ Detention system description. <br /> ■ Operational scenarios with control structure configurations. <br /> ■ Operational strategies to manage pond levels year-round to meet project goals and <br /> maintain water quality and pond aesthetics. <br /> ■ System operation and maintenance elements. <br /> ■ Appendices that will include record drawings, any agreements between Utilities and <br /> Parks, and other supporting documentation. <br /> 15.4 Hydraulic and Hydrologic Modeling <br /> To support the development of the Manual, hydraulic and hydrologic model simulations will be <br /> completed to assess the current performance and provide operational and control strategies for <br /> the pond system. Modeling will include the following elements: <br /> ■ Assess the performance and validate hydraulic model with field data collected by the <br /> City, if available. <br /> ■ Simulate typical annual inflow patterns and approximate the appropriate storage <br /> volumes and maximum pond level needed for adequate detention. Determine if <br /> seasonal pond level adjustments are appropriate and provide recommended timing <br /> and action. <br /> ■ Identify the type of rain forecast that would trigger the need to open the control valves <br /> to intentionally lower the pond level for extra (maximum) storage volume. <br /> ■ Characterize what types of rain events would cause either of the CDS units to go into <br /> "bypass mode" or otherwise create unacceptable tail-water conditions into the <br /> collection network. <br /> ■ Characterize overflow rate through the restrictor orifices and over weirs versus pond <br /> depth. <br /> All model results will be documented in the Manual with supporting information presented in the <br /> appendices, as needed. <br /> City of Everett MURRAYSMITH Legion Golf Stormwater <br /> July 2019 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.