My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2135
>
Ordinances
>
Ordinance 2135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2024 4:03:40 PM
Creation date
7/5/2024 4:03:35 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2135
Date
4/15/1924
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
di <br /> ORDINANCE NO. 21 35 <br /> An Ordinance providing for the improvement of Oakes Avenue <br /> from Hewitt Avenue to 35th Street, by removal of old lumber, grading <br /> to proper grade, construction of concrete curbs, installation of <br /> necessary drainage, making necessary water main changes. Also by <br /> the construction of a 6 inch Portland Cement Concrete pavement 52 <br /> feet wide from Hewitt Avenue to Wall Street; 40 feet wide from Wall <br /> Street to the north line of Pacific Avenue. , and 28 feet wide from <br /> the south line of Pacific Avenue to 35th Street and doing all other <br /> work necessary in connection therewith to make a complete improvement, <br /> all in accordance with iesolution No. 3067 of the City of Everett, <br /> creating an assessment district, creating a ,ocal Improvement District <br /> Fund therefor, providing that said improvement be made by special <br /> assessment upon the property in said district under the mode of <br /> payment by bonds, <br /> Whereas, by Resolution No.3067 of the City of Everett, <br /> the City Council of Everett has declared its intention to order <br /> the improvement of Oakes Avenue from Hewitt Avenue to 35th Street, <br /> by removal of old lumber, grading to proper grade, construction of <br /> concrete curbs, installation of necessary drainage, making necessary <br /> water main changes. Also by the construction of a 6 inch Portland <br /> Cement Concrete pavement 52 feet wide from Hewitt Avenue to Wall.St. <br /> 40 feet wide from Wall Street to the north line of Pacific Avenue <br /> and 28 feet wide from the south line of x'acifi c Avenue to 35th Street . , <br /> and doing all other work necessary in connection therewith to make <br /> a complete improvement in accordance with the plans and specifica- <br /> tions prepared by the City Engineer, now therefore, <br /> THE CITY OF EVERETT DOES ORD.. N : <br /> Section 1 : That Oakes Avenue from Hewitt Avenue to 35th St. <br />
The URL can be used to link to this page
Your browser does not support the video tag.