My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fidalgo Paving & Construction LLC 7/23/2025 Change Order 1
>
Contracts
>
6 Years Then Destroy
>
2025
>
Fidalgo Paving & Construction LLC 7/23/2025 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 10:11:44 AM
Creation date
7/24/2025 10:11:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Fidalgo Paving & Construction LLC
Approval Date
7/23/2025
End Date
8/16/2025
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Forest Park Entry Driveway Repave Project
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004864
Total Compensation
$39,485.97
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Fidalgo Paving & Construction LLC 7/2/2025
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ 2025-029 Forest Park Entry Driveway Repave Project <br />Description of Change: (Attach contractor change proposal and cost schedule) (Attach Price or Cost Analysis) <br />BUILDING/LOCATION: 802 E Mukilteo Boulevard, Everett, WA 98203 <br />This change order increases the total project price. <br />During the pre-construction walkthrough, the contractor identified that the final calculations from the site drawings <br />did not match the drawing notes. After the project manager and the contractor recalculated, the estimated square <br />footage did not include the 795 square feet for the driveway entrance apron. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change, <br />including tax $34,069.00 Contract Time & Completion Date Prior <br />to This Change 45 <br />Completion Date <br />Prior <br />08/16/25 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change, including tax +$5,416.97 Net (Increase) or (Decrease) Resulting <br />from this Change 0 <br />* Total Project Price Including this Change, <br />including tax $39,485.97 Contract Time & Completion Date <br />Including This Change 45 <br />Completion Date <br />After <br />08/16/25 <br />By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent described in <br />all such <br />changes, including all direct and indirect costs and impacts. The City of Everett and the Contractor further agree that Contract <br />time shall be adjusted to the extent shown above. This Change Order only changes the contract between City of Everett and <br />the Contractor to the extent explicitly provided in this Change Order. Signatures on this change order may be ink, scanned pdf <br />signature, or other electronic means (such as AdobeSign). <br />CONTRACTOR CITY OF EVERETT <br />Fidalgo Paving & Construction LLC <br />16825 45 Road <br />Arlington, WA 98223 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 Date <br />Project Manager: <br />Division Manager: <br />Department <br />Director: <br />Name & Title:Jeff Mason, Managing Member City Attorney Template Approved as to Form 7.14.23 <br />Date:Mayor: <br />*WA Use Tax on materials included. WAC 458-20-171 <br />Attest: ___________________________ <br />Office of the City Clerk <br />0001 <br />7/17/25 <br />7/18/25 <br />7/18/25 <br />Jeff Mason <br />07/22/2025 07/23/2025
The URL can be used to link to this page
Your browser does not support the video tag.