Laserfiche WebLink
LEGEND <br /> 9 1 T <br /> 3 <br /> I . N <br /> x �x <br /> 44 DUST x x x x x x x x x x x— x Tx x x <br /> q gg <br /> TOOLING EQUIPMENT GENERAL NOTES <br /> MAINTENANCE SERVICES <br /> 0 0 <br /> x x x F4R <br /> �a[x x x x x x —X x x x x <br /> I I I I <br /> CONSTRUCTION NOTES <br /> CONNECT TO DUST COLLECTOR OUTLET. COORDINATE <br /> DUCTWORK ROUTE TO MINIMIZE ELBOWS. <br /> ROUTE DUST COLLECTOR DUCTWORK AT 6 INCHES <br /> ABOVE SHOP FENCE. PROVIDE UNISTRUT SUPPORT <br /> AND CLEANOUTS ALONG ROUTE AS RECOMMENDED <br /> BY DUCTWORK MANUFACTURER. <br /> [1:�:- ROUTE DUCT DOWN TO ELEVATION OF CONNECTION <br /> TO DISC SANDER. COORDINATE TERMINATION POINT <br /> WITH OWNER FOR FINAL HARD/FLEX DUCT <br /> CONNECTION. MINIMIZE USE OF ELBOWS. <br /> I I I I <br /> 1 3 5 9 11 <br /> 0.9 11' <br /> B DG 40125 <br /> OD <br /> N <br /> 0 1M11*I 1M12*11M13*I 1M14 0 <br /> N3 I <br /> 1M 15 M1 1M01 <br /> 1 M21 11 M22 11 M23 11 M24 m <br /> P <br /> M25 1M26 1M27 1M28 1M29 <br /> — R <br /> FUTURE BLDG 40-027 <br /> — — — — — — — — — — — — - * DENOTES PLANS <br /> BUILDING 40-026 NOT INCLUDED <br /> MATCH LINE SEE DWG M15 KEY PLAN IN THIS SET. <br /> SCALE: NONE N <br /> Additional Permits Are Required <br /> For This Project To Include: Permit#: M2407-078 <br /> Site Address: 3003 W CASINO RD BLDG 40-26 <br /> Owner: BOEING COMPANY <br /> �[ Plumbing Sprinkler Application Date: 7/24/2024 <br /> SUBJECT TO FIELD Description: BLDG 40-26 1ST FLR HVAC, <br /> PARTIAL FIRST FLOOR HVAC PLAN \ ❑ Mechanical X Fire Alarm Compressed Air,Vacuum and Water <br /> SCALE:1/8"=1'-0" FIN. ELF. ELEV. 92'-0" I Electrical ❑ Public Works INSPECTION Review Status: Permit Approved; <br /> Subject to Field Inspection <br /> Review Date: 7/30/2024 <br /> DCN-01, SCOPE CLAR. ADD. City of Everett Permit Review <br /> Office or Community,APPROVED Economic Developmenc � Affiliated EVEeEtt Status:Reviewed for Permit <br /> PLANNING DEPARTMENT Amm Engineers 07/30/2024 4:03:01 PM <br /> NAME: Je55icaJarvi ARil2 R En9lneers, <br /> Ina. ISSUED FOR CONSTRUCTION <br /> 5802 Research Park Boulevard 4 2 0 4 8 1 2 1 6 20 <br /> DATE: 08/08/2024 Madison,Wisconsin 53719 <br /> Te1608.238.2fi16 DESIGN BY AEI DATE 03.25.24 <br /> Project#: <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE AWN A SUBTITLE CURRENT REVISION YM OL DATE <br /> ACCEPTABILITY R.ANDERSON 03.25.24 PARTIAL FIRST FLOOR HVAC PLAN ws8613so�g1LG 1 o3.zs.z4 <br /> ORIC-01 737 NL—40-26 DP 26.02—DCN-01 SCOPE CLAR.ADD.W8861360 AEI B. FRIEDMAN 03.25.24 �oe .� THIS DESIGN AND/OR CHECKED <br /> SPECIFICATION IS APPROVED P. ROEDL 03.25.24 SHEET <br /> BOE/A/G® <br /> APPROVED BY DEPT. DATE EHECKER e 737 NORTH LINE — 40-26 TOWER RELOCATIONS DP 26.02 1 M 1 0 <br /> CHECKED <br /> APPROVED BUILDING 40-26 JOB NO. COMP NO. <br /> 03/25/2024 B. FRIEDMAN 03.25.24 <br /> APPROVED MECHANICAL MASTER COL. N—N.3/0.9-3 EVERETT, WA DWG No. 40-26-1M10 <br />