Laserfiche WebLink
ORDINANCE NO. / � g— k-7 <br /> AN ORDINANCE amending section 2 and adding section 10 <br /> to Ordinance No . 949-83 which created "1983 Block <br /> Grant Neighborhood Improvement Fund No. 360. <br /> Section 1 : That Section 2 of Ordinance NO. 949-83 which read as <br /> follows : <br /> Section 2 : Authorization is hereby given to provide for the <br /> development of contract plans, specifications and detailed cost <br /> estimates and construction required to provide the following : <br /> A . Lowell Neighborhood Improvements <br /> 1 . Allocate $2 ,000. 00 for neighborhood wide refuse clean-up <br /> project . <br /> 2. Allocate $2 , 000. 00 for rodent control project including <br /> baiting of manholes . <br /> 3. Allocate $100. 00 for payment to Lowell Community Church <br /> for meeting space/heating for neighborhood meetings. <br /> 4 . Allocate $25,000.00 for the following drainage <br /> improvements : <br /> a . Ditch improvement on the west side of South 4th <br /> Avenue from 49th Street to 47th Street . <br /> b. Construct a ditch on the west side of South 4th <br /> Avenue from Bigelow to Main Street and connect to the <br /> existing storm sewer on South 3rd Avenue. <br /> c . Ditch improvement on the west side of South 4th <br /> Avenue from the west end of Lenora to Ravenna Creek. <br /> d . Replace the existing culvert under South 2nd <br /> Avenue between 49th Street S .E. and Bigelow and <br /> upgrade the capacity . <br /> e. Replace the existing culvert under South 2nd <br /> Avenue at Lenora and upgrading capacity . <br /> B . Northeast Everett Neighborhood Improvements <br /> 1. State Street - 18th Street to 19th Street - Construct <br /> curbs, gutters , and sidewalk on East and West side and <br /> provide storm drainage and overlay existing roadbed. <br /> (Estimated project cost : $60, 000. ) <br /> C . Port Gardner Neighborhood Improvements <br /> 1 . Pedestrian walkway on Charles Avenue east of Friday <br /> Avenue . Estimated cost : $5,000. <br /> 2. Install curb and gutter on 43rd Street from the alley <br /> west of Rucker to Grand Avenue . Estimated cost : $3,750. <br /> 3. Sidewalks replaced on the south side of street , 900 <br /> block of Wall Street . Estimated cost : $3, 750. <br /> 4. Construct new curb and gutter on both sides and sidewalk <br /> on one side of the 3600 block of Friday Avenue , from Earl to <br /> Clinton. Estimated cost : $50, 000. <br />