Laserfiche WebLink
T r t <br /> ORDINANCE NO. _�i�' 3 -7 9 <br /> AN ORDINANCE amending Sections 2, 5 and 6 of Ordinance <br /> NO. 473-77 creating a special design and construction fund <br /> entitled "Maple Heights Bridge Replacement" and increasing <br /> the expenditure required for this project to $1,411,775. <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> That Sections 2, 5 and 6 of Ordinance No. 473-77 which read as follows: <br /> Section 2: <br /> Approval of the "Supplemental Agreement to Phase I Maple Heights Bridge <br /> Preliminary Engineering Study to provide for Phase II follow-on detail design <br /> and Phase III construction support," for a cost not to exceed $50,600 is hereby <br /> granted and the Mayor is authorized to enter into formal contract with the <br /> consultant for the design of the replacement structure based Alternate Number <br /> 3 (Concrete Prestressed Girder) as presented in the Preliminary Design Study. <br /> Section 5: <br /> The City Treasure of the City of Everett is hereby authorized to issue <br /> construction warrants as funds are required, but not to exceed $69,600 to a <br /> local bank for interim construction financing at a reasonable rate of interest. <br /> Section 6: <br /> a. The sum of $69,600 is hereby appropriated to Fund "MAPLE HEIGHTS <br /> BRIDGE REPLACEMENT" for the purposes herein specified in the following <br /> manner. <br /> Phase II Design (FUND 321 PROGRAM 694) <br /> Detail Design by Consultant <br /> (Howard Needles Tammen & Bergendoff) $50,600 <br /> Right-of-Way 7,000 <br /> In-house Engr. and Admin. 12,000 <br /> TOTAL $69,600 <br /> b. Source of Funds <br /> Phase II Design <br /> F.A.M. $55,000 <br /> Gas Tax 14,600 <br /> TOTAL $69,600 <br /> c. This appropriation shall not lapse, but shall be carried forward from year <br /> to year until fully expended or the purpose has been accomplished or <br /> abandoned without necessity of reappropriation as per R.C.W. 35.33.151. <br /> -1- <br />