Laserfiche WebLink
Upon resubminal of the drawings, your application will he given priority and plan review will <br />rcconuncnce. <br />All required submittals shall he of sufficient detail and contain sufficient information to ensure <br />that the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />Steve Miller <br />Associate laigineer <br />YJIyPM1Mnr IIJkt 110101d0111M IOTA SN'1 <br />