My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F D Thomas Inc 9/9/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2020
>
F D Thomas Inc 9/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:10:38 AM
Creation date
9/10/2019 10:08:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
F D Thomas Inc
Approval Date
9/9/2019
Council Approval Date
8/28/2019
End Date
2/13/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everpark Garage Structural Repairs
Tracking Number
0001981
Total Compensation
$1,386,761.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> ' Everpark Garage Repairs Addendum No.4 <br /> Response: Corrosion inhibiting products in both Specification 030130 Sections 2.4 A and 2.4 B <br /> should be provided per Note 2 in both Details 19 and 20/S.11. This is intended to apply at the <br /> patch locations, as noted. The Surface Applied Corrosion-Inhibiting Treatment should extend 6 <br /> inches minimum past the extents of the patch along the path of the reinforcing at each <br /> ' reinforcing location. <br /> ITEM 5—Can a base bid quantity and unit price be established for the overhead beam repairs as <br /> ' was done with the floor repairs? <br /> Response: Per Detail 19/S.11, a 3-inch minimum overhead patch width is expected. Note that <br /> ' typical overhead patches each run along the length of a single bar, so the total quantity should <br /> be straight-forward to determine from the plan. Please see the attached, revised Bid form in <br /> Addendum 3 requiring a unit price for additional patching. A base value of 30 additional lineal <br /> feet is expected. <br /> All other requirements of the plans and specifications remain in effect. <br /> This addendum shall be attached to and made part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> ' END OF ADDENDUM NO.4 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.