Laserfiche WebLink
• <br /> I <br /> City of Everett <br /> ' Everpark Garage Repairs Addendum No.3 <br /> Response: FRP samples and information are to be submitted to the City of Everett. The <br /> information noted is to be treated as a submittal, with standard submittal review schedule per <br /> the specifications. <br /> ITEM 4— Please clarify who is to pay for the FRP material testing noted on the drawings and as <br /> ' required in specification section 03 013072, 3.3. 4. <br /> Response: The owner provides special inspection and testing services for the FRP materials and <br /> installation. <br /> ITEM 5— Please clarify who is paying for the Certified Special Inspector required for the FRP <br /> ' installation in specification section 03 013072, 3.3, A, 2. 5. <br /> Response: The owner has selected and will provide financial responsibility for Certified Special <br /> ' Inspector for FRP installation. <br /> ITEM 6—The drawings say the concrete repairs and locations are approximate and must be <br /> field verified.This cannot be determined by the bidding contractors unless they sound the <br /> entire garage. Can a square foot quantity for the concrete slab and overhead repairs be <br /> provided so that each contractor can be bidding the same scope of work?Although a lineal <br /> footage is provided,the widths can vary greatly and affect the total quantity of work that is <br /> unknown prior to work being performed.Typically unit prices are submitted as well for <br /> ' variation +/-from base bid quantities as the deterioration extents are a buried condition. Can <br /> unit prices for variations be added to the bid form? <br /> ' Response: The intent is for visual review of the garage only. Detailed concrete surface testing, <br /> such as sounding, is not anticipated. Lineal foot information provided in the drawings is <br /> measured longitudinally along the reinforcing lines. Typical reinforcing spacing is 8 inches to 9 <br /> ' inches on-center. Detail 20/S.11 indicates a 9 inch minimum width to be assumed at typical <br /> locations. The lineal foot number can be multiplied by the 9 inch width to provide an estimated <br /> ' square footage value at each location. Replace Specification 00 4113 Bid Form with Attached <br /> SECTION 00 41 13 (Revision A 6/19/19) BID FORM with unit pricing for additional slab repairs. <br /> ' ITEM 7—Multiple overhead lines on the east elevation at the alley are very close to the column <br /> CRFP work that will wrap around to the exterior. What are these lines and do they require <br /> covering per OSHA guidelines to safely access the work? <br /> ' Response: All other requirements of the plans and specifications remain in effect. <br /> ' ITEM 8—What are the requirements for phasing of the work?What is the maximum amount of <br /> parking spaces that can be closed at one time? <br /> t Response: Refer to section General Conditions 00 7200, Construction Schedule 5.2.2, and 00 <br /> 7300, Part 5, Working Hours 5.1, General Contractor will be required to provide a project <br /> schedule that clearly defines each phase of work including planned facility closure(s), length of <br /> ' time area(s) is/are to be closed, and projected reopening of affected area(s). <br /> Page 2 of 5 <br /> i <br />