My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 0000 - 10 <br /> Diversion Dam Road Project Phase 3 UT 3707 & UT 3708 <br /> ' 3.6 EXCAVATION FOR TRENCHES <br /> 3.7 STORAGE OF SOIL MATERIALS <br /> 3.8 BACKFILL-GENERAL <br /> 3.9 CULVERT TRENCH SOIL BACKFILL <br /> ' 3.10 CULVERT TRENCH SHOT ROCK BACKFILL <br /> 3.11 COMPACTION OF SOIL BACKFILLS AND FILLS <br /> 3.12 INSTALLATION OF WARNING TAPE <br /> 3.13 GRADING <br /> 3.14 FINAL GRADE LIFT- HAYBECKER CREEK <br /> 3.15 ROAD GRADE AND DITCH - CLIFF SECTION <br /> ' 3.16 CRUSHING <br /> 3.17 BLASTING <br /> 3.18 CRUSHED SURFACING BASE COURSE LIFT <br /> ' 3.20 PROTECTION <br /> 3.21 DISPOSAL OF SURPLUS AND WASTE MATERIALS <br /> SECTION 31 2500- EROSION AND SEDIMENTATION CONTROL <br /> ' 1.1 RELATED WORK SPECIFIED ELSEWHERE <br /> 1.2 QUALITY CONTROL <br /> 1.3 SCHEDULE <br /> ' 2.1 EROSION AND SEDIMENT CONTROL PLAN <br /> 2.2 GRASS SEED <br /> 2.3 STRAW <br /> ' 2.4 SEDIMENT RETENTION WATTLE <br /> 3.1 EROSION CONTROL <br /> 3.2 SEDIMENT RETENTION WATTLE <br /> 3.3 EXISTING DRAINAGE FACILITIES <br /> ' 3.4 DRAINAGE DIVERSION <br /> SECTION 33 4000 -STORM DRAINAGE SYSTEM <br /> 1.1 SUMMARY <br /> 1.2 QUALITY ASSURANCE <br /> 1.3 SUBMITTALS <br /> 2.1 MATERIALS <br /> 3.1 PREPARATION <br /> 3.2 INSTALLATION <br /> ' 3.3 FIELD QUALITY CONTROL <br /> APPENDICIES <br /> ' A CITY OF EVERETT- PIT STOCKPILE PLAN <br /> B TIMBER CRUISE <br /> C INDUSTRIAL FIRE PROTECTION LEVEL PLAN AND FIRE STANDARD OPERATING <br /> PROCEDURE <br /> CONSTRUCTION PLANS <br /> 00 0000 - 10 TABLE OF CONTENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.