My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1418 106TH PL SE BLDG B 2019-09-12
>
Address Records
>
106TH PL SE
>
1418
>
BLDG B
>
1418 106TH PL SE BLDG B 2019-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 3:59:24 PM
Creation date
9/12/2019 3:59:21 PM
Metadata
Fields
Template:
Address Document
Street Name
106TH PL SE
Street Number
1418
Tenant Name
BLDG B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It <br /> Nov. 18th, 2014 <br /> ' <br /> 0 <br /> firat <br /> ARCHITECTURAL DESIGN <br /> ASSOCIATES, PS EC -ENE <br /> r, <br /> Tony R. Lee, Building Official <br /> Jeff Heilman, Plans Examiner <br /> City of Everett, Building Department NOV 1 8 'e U,4 ! $' <br /> Permit Services Public CounterCIT ��, �. i <br /> 3200 Cedar Street, 2nd Floor PYOit Srl°!%e 8 <br /> Everett WA 98201 .— _., <br /> Project Name: Pacific Ridge Homes, Northlake Court Townhomes Building 'B' <br /> Project#: C409-040 thru 043 <br /> Dear Mr. Lee, <br /> Pursuant to the Comment Letter dated October 13th 2014. Below you will find the <br /> listed revisions referenced in the accompanying Plans & Calculations. <br /> Comment Notice #1 <br /> Review Type BUILDING Date October 13, 2014 <br /> Project Address 106th PI SE Reviewer Tony Lee <br /> Address City of Everett Building Department Reviewer Phone (425) 257-8810 <br /> Permit Services <br /> 3200 Cedar Street, 2"d Floor Reviewer Email <br /> Everett, Wa 98201 <br /> Codes Reviewed <br /> This project has been reviewed for conformance with the 2012 International Residential Code <br /> (IRC), as amended by the State of Washington and/or the Washington State Energy Code, 2012 <br /> edition, unless noted otherwise. <br /> Comments w/corrections <br /> 1.Detail 3a/A4.2 shows fire-rating treatment at the floor to wall intersection. The detail <br /> appears to be for a one-hour wall however and the project requires a two-hour wall <br /> assembly. Section R302.2 <br /> a) Detail 3a/A4.2 has been revised to reflect the requirement of a 2-Hr wall assembly <br /> 2.The roof of unit 5 is shown to be at least 30" above the roof at unit 4. The wall continuing <br /> above unit 5 to the underside of the roof of unit 4 should be shown to be of not less than <br /> one-hour construction (5/8" gyp sheathing should be shown on exterior side of the attic <br /> wall at the step roof condition). Section R302.2.2. <br /> a) Detail 4 on sheet A4.1 showing the 1-hr required ass)bly has been add to the set and <br />
The URL can be used to link to this page
Your browser does not support the video tag.