Laserfiche WebLink
�� <br />The following sections of this report present more detailed recommendations <br />� for the various geotechnical engineering aspec[s of the project which should <br />� ba incorporated into the project design and construction. <br />� <br />' Fuundations <br />� <br />The proposed building should be supported on continuous and/or isolated <br />apread footings bearing on a minimum of two feet of structural fill placed <br />below footing bottoms. The structural fill should be placed after removing <br />the existing fills in the footing areas to the designared depths. The <br />removal should extend two feet below footing bottoms as well ns tao .�et <br />laterally outside the footings in both directions. All footings should <br />extend to a minimum dep[h of 18 inches below the loiaest adjacent final grade. <br />Anq interior footing areas should also be overexcava[ed and replaced with <br />structural fill. <br />T'he rockery adjecent to the east and north sides of the building may <br />complicete the overexcavation process. The perimeter footings along thrse <br />sides of the building should be pleced at a sufficient depth so that they <br />impose no additional lateral pressure on the existing rockery. We auggest <br />the footings be based at a level at or below the bese of the rockery. The <br />recommended overexcavation depth and width for foo[ing support should then be <br />provided below [het footing level. <br />Continuous footings bearing on structural fill may be designed for an <br />allowable beering pressure of 1,500 pounds per squere foot (psf), for dead <br />plue live loeds. A minimum width of 12 inches should be used for continuous <br />footings. Individual spread footings mny alsa be designed for a� allowable <br />bearing pressure of 1,500 paf and should heve a minimum size of 18 inches. A <br />one-third increase in the above bearing pressures may be used when <br />cansidering wind or seismic loads. All footings should be provided with <br />ateel reinforcement in accordance with structural requirements. <br />To verify that footing bearing surfaces are satisfactory, that excessive <br />disturbance does not occur during excavation, and to observe compliance with <br />our recommendations, we recam�end that all foo[ing excavations be examined by <br />our representative prior to placing concrete. A minimum of tvo aorking days <br />notice should be gLven us prior to examinetion of foundation excavations. <br />Settlements <br />We an[icipate that the maximum total set[lements for the building supported <br />on an adequately compacted structural fill mat vill be less than one inch. <br />The maximum long-term differential settlement should be less than one-half <br />inch. <br />Projec[ No. T-233, Pa�e 5 <br />