My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 woody plant cuttings in various forms as well as part of streambank or earthen slope <br /> 2 construction. <br /> 3 <br /> 4 8-02.3(15)A Fascines <br /> 5 Live fascines shall be constructed of live and dead cuttings bundled together with <br /> 6 a diameter of 8 to 18 inches. Live cuttings shall be the species shown in the <br /> 7 Plans. Dead branches may be cuttings from any woody, non-invasive plant native <br /> 8 to the project area. Dead branches may be placed within the live fascine and on <br /> 9 the side exposed to the air. Live branches shall be placed in contact with the soil <br /> 10 along their entire length. Each live fascine must contain a minimum of eight live <br /> 11 branches. Dead branches shall constitute no more than 40 percent of the total <br /> 12 fascine content. <br /> 13 <br /> 14 The total length of each live fascine shall be a minimum of 5 feet. Branches shall <br /> 15 be bundled into log-like forms and bound with biodegradable twine spaced at 1- <br /> 16 foot intervals along the entire length of the live fascine. Live fascines shall be <br /> 17 installed horizontally in a trench whose depth shall be 1/2 the diameter of the live <br /> 18 fascine. Secure the live fascine with live stakes 3 feet in length and % inch in <br /> 19 diameter placed at 18-inch intervals. A minimum of three live stakes shall be used <br /> 20 per fascine. The live stakes shall be driven through the live fascine vertically into <br /> 21 the slope. The ends of live fascines shall be woven together so that no gap <br /> 22 remains between the two sections of the live fascine. <br /> 23 <br /> 24 Prior to being covered with soil, the fascine shall be thoroughly watered. Once the <br /> 25 fascine is covered with 6 inches of soil, the soil covering the fascine shall be <br /> 26 thoroughly watered. <br /> 27III <br /> 28 When used to remedy erosion areas, live fascines shall extend a minimum of two <br /> 29 feet beyond the visible area of erosion and soil disturbance. The locations for live <br /> 30 fascines and live stake rows shall be identified in the field for review and <br /> 31 acceptance by the Engineer. The Engineer may require adjustment of fascine <br /> 32 locations prior to installation in order to best accomplish the intended functions. <br /> 33 <br /> I <br /> 34 Plant replacement during plant establishment for "PSIPE Live Fascine" will be <br /> 35 required for any section void of live shoots for a length of 3 feet or more. <br /> 36 Replacement shall consist of installing live stakes, spaced 1 foot apart above the <br /> 37 fascine within the area void of live shoots. Live stakes shall be of the same <br /> 38 species as the live fascine and shall have a minimum length of 3 feet and a <br /> 39 minimum diameter of 3/ inch. The requirements of Section 8-02.3(8) apply to <br /> 40 PSIPE Live Fascine. <br /> 41 <br /> 42 8-02.3(15)B Brush Mattress <br /> 43 Live brush mattress shall be constructed of live branch cuttings, live poles, jute <br /> 44 rope and topsoil. The live cuttings and live poles shall be from the plant species <br /> 45 designated in the Plans. Live branch cuttings shall be placed with the cut ends <br /> 46 oriented down slope as shown in the Plans. Cuttings shall overlap from side to <br /> 47 side and from top to bottom as each layer is constructed. The live branches in <br /> 48 each succeeding upper layer shall overlap the adjacent lower layer by a minimum <br /> 49 of 6 inches. A maximum of 20 percent of the branches may be dead branches, <br /> 50 but the live branches shall be distributed evenly to provide even rooting and <br /> 51 growth over the entire area of the brush mattress. <br /> City of Everett Page AM-102 Amendments I <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.