My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 <br /> 2 Live Stake Row will be measured by the linear foot along the ground slope line. <br /> I 3 <br /> 4 The pay quantities for plant materials will be determined by count of the number of <br /> 5 satisfactory plants in each category accepted by the Engineer. <br /> I 6 <br /> 7 Fascine and PSIPE live fascine will be measured by the linear foot along the ground slope <br /> 8 line. <br /> 9 <br /> II 10 Brush mattress and PSIPE live brush mattress will be measured by the surface square yard <br /> 11 along the ground slope line. <br /> 12 <br /> I 13 Brush layer and PSIPE brush layer will be measured by the linear foot along the ground <br /> 14 slope line. <br /> 15 <br /> I 16 Water will be measured in accordance with Section 2-07.4. Measurement will be made of <br /> 17 only that water hauled in tank trucks or similar equipment. <br /> 18 <br /> 19 8-02.5 Payment <br /> I20 Payment will be made for each of the following listed Bid items that are included in the <br /> 21 Proposal: <br /> 22 <br /> I 23 "Project Area Weed and Pest Control"will be paid in accordance with Section 1-09.6. <br /> 24 For the purpose of providing a common Proposal for all Bidders, the Contracting <br /> 25 Agency entered an amount for "Project Area Weed and Pest Control" in the Proposal <br /> I 26 to become a part of the total Bid by the Contractor. Payment under this item will be <br /> 27 made only when the Work is not already covered by other items. <br /> 28 <br /> I29 "Topsoil Type ", per acre. <br /> 30 The unit Contract price per acre for "Topsoil Type " shall be full payment for all <br /> 31 costs for the specified Work. <br /> 32 <br /> I 33 "Fine Compost", per acre or per square yard. <br /> 34 "Medium Compost", per acre or per square yard. <br /> 35 "Coarse Compost", per acre or per square yard. <br /> I 36 The unit Contract price per acre for "Fine Compost", "Medium Compost" or "Coarse <br /> 37 Compost" shall be full pay for furnishing and spreading the compost onto the existing <br /> 38 soil. <br /> 39 <br /> I40 "Soil Amendment", per acre. <br /> 41 The unit Contract price per acre for "Soil Amendment" shall be full pay for furnishing <br /> 42 and incorporating the soil amendment into the existing soil. <br /> I 43 <br /> 44 "Plant Selection ", per each. <br /> 45 The unit Contract price for "Plant Selection ", per each shall be full pay for all Work <br /> I 46 to perform the work as specified within the planting area prior to planting for weed <br /> 47 control, planting area preparation and installation of plants with initial watering. <br /> 48 <br /> 49 As the plants that do not include plant establishment are obtained, propagated, and <br /> I 50 grown, partial payments will be made as follows: <br /> 51 <br /> I City of EverettPage AM 105 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.