Laserfiche WebLink
I <br /> I 1 Plant establishment milestones are achieved whenlantin areas meet conditions <br /> p 9 <br /> 2 described in Section 8-02.3(13). <br /> I 3 <br /> 4 "Seeding, Fertilizing and Mulching", per acre. <br /> 5 <br /> I 6 "Seeding and Fertilizing", per acre or per square yard. <br /> 7 <br /> 8 "Seeding and Fertilizing by Hand", per square yard. <br /> 9 <br /> I 10 "Second Application of Fertilizer", per acre. <br /> 11 <br /> 12 "Seeding and Mulching", per acre. <br /> I 13 <br /> 14 "Seeded Lawn Installation", per square yard. <br /> 15 "Sod Installation", per square yard. <br /> I 16 "Lawn Mowing", per square yard. <br /> 17 The unit Contract price per square yard for "Seeded Lawn Installation" or "Sod <br /> 18 Installation" shall be full pay for all costs necessary to prepare the area, plant or sod <br /> 19 the lawn, erect barriers, control weeds, and establish lawn areas and for furnishing all <br /> I20 labor, tools, equipment, and materials necessary to complete the Work as specified <br /> 21 and shall be paid in the following sequence for healthy, vigorous lawn: <br /> 22 <br /> I 23 <br /> 24 Completion of Lawn Planting 60 percent of individual areas <br /> 25 Mid Lawn Establishment (after two mowings) 85 percent of individual areas <br /> I 26 <br /> 27 Completion of Lawn Establishment 100 percent of individual areas <br /> 28 (after four mowings) <br /> 29 <br /> I <br /> 30 "Plant Establishment Year "will be paid in accordance with Section 1-09.6. <br /> 31 For the purpose of providing a common Proposal for all Bidders, the Contracting <br /> 32 Agency entered an amount for "Plant Establishment - Year" in the Proposal to <br /> II 33 become a part of the total Bid by the Contractor. <br /> 34 <br /> 35 "Live Pole", per each. <br /> I 36 <br /> 37 "Live Stake Row", per linear foot. <br /> 38 <br /> 39 "Bark or Wood Chip Mulch", per acre. <br /> I 40 <br /> 41 "Bark or Wood Chip Mulch Rings", per each. <br /> 42 The unit Contract price per acre for "Bark or Wood Chip Mulch" shall be full pay for <br /> I 43 furnishing and spreading the mulch onto the existing soil. <br /> 44 <br /> 45 "Fascine" and "PSIPE Live Fascine", per linear foot. <br /> I 46 "Brush Mattress" and "PSIPE Live Brush Mattress", per square yard. <br /> 47 "Brush Layer" and "PSIPE Brush Layer", per linear foot. <br /> 48 When PSIPE is included with Fascine, Brush Mattress, or Brush Layer, the payment <br /> 49 schedule for PSIPE will apply. <br /> 1 50 <br /> I City of EverettPage AM-107 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />