My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 "Roadside Maintenance under Construction" will be paid in accordance with Section 1- <br /> 2 09.6. <br /> 3 For the purpose of providing a common Proposal for all Bidders, the Contracting <br /> 4 Agency has entered an amount for "Roadside Maintenance Under Construction" in the <br /> 5 Proposal to become a part of the total Bid by the Contractor. <br /> 6 <br /> 7 "Water", per M Gal. <br /> 8 <br /> 9 <br /> 10 Section 8-04, Curbs, Gutters, and Spillways <br /> 11 April 2, 2018 <br /> 12 8-04.2 Materials <br /> 13 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 14 <br /> 15 Cement 9-01 <br /> 16 <br /> 17 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> 18 The first paragraph is supplemented with the following: <br /> 19 <br /> 20 Roundabout truck apron cement concrete curb and gutter shall be constructed with air <br /> 21 entrained concrete Class 4000 conforming to the requirements of Section 6-02. <br /> 22 <br /> 23 Section 8-06, Cement Concrete Driveway Entrances <br /> 24 April 2, 2018 <br /> 25 8-06.2 Materials <br /> 26 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 27 <br /> 28 Cement 9-01 <br /> 29 <br /> 30 8-06.3 Construction Requirements <br /> 31 The first paragraph is revised to read: <br /> 32 <br /> 33 Cement concrete driveway approaches shall be constructed with air entrained concrete <br /> 34 Class 4000 conforming to the requirements of Section 6-02 or Portland Cement or Blended <br /> 35 Hydraulic Cement Concrete Pavement conforming to the requirements of Section 5-05. <br /> 36 <br /> 37 Section 8-07, Precast Traffic Curb I <br /> 38 April 2, 2018 <br /> 39 8-07.3(1) Installing Curbs <br /> 40 The first sentence of the first paragraph is revised to read: <br /> 41 <br /> 42 The curb shall be firmly bedded for its entire length and breadth on a mortar bed <br /> 43 conforming to Section 9-20.4(3) composed of one part Portland cement or blended <br /> 44 hydraulic cement and two parts sand. <br /> 45 <br /> 46 The fourth paragraph is revised to read: <br /> 47 <br /> City of Everett Page AM-108 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.