My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 All joints between adjacent pieces of curb except joints for expansion and/or drainage as <br /> 2 designated by the Engineer shall be filled with mortar composed of one part Portland <br /> I 3 cement or blended hydraulic cement and two parts sand. <br /> 4 <br /> 5 Section 8-09, Raised Pavement Markers <br /> I6 April 1, 2019 <br /> 7 8-09.5 Payment <br /> I 8 The last paragraph is revised to read: <br /> 9 <br /> 10 The unit Contract price per hundred for "Raised Pavement Marker Type 1", "Raised <br /> 11 Pavement Marker Type 2", "Raised Pavement Marker Type 3 In.", and "Recessed <br /> 12 Pavement Marker" shall be full pay for furnishing and installing the markers in accordance <br /> 13 with these Specifications. <br /> 14 <br /> I 15 Section 8-11, Guardrail <br /> 16 April 1, 2019 <br /> I 17 8-11.3(1)A Erection of Posts <br /> 18 The first sentence of the first paragraph is revised to read: <br /> 19 <br /> I 20 Posts shall be set to the true line and grade of the Highway after the grade is in place and <br /> 21 compaction is completed. <br /> 22 <br /> 23 8-11.3(1)C Terminal and Anchor Installation <br /> I 24 The first paragraph is revised to read: <br /> 25 <br /> 26 All excavation and backfilling required for installation of anchors shall be performed in <br /> I 27 accordance with Section 2-09, except that the costs thereof shall be included in the unit <br /> 28 Contract price for the anchor installed. <br /> 29 <br /> I 30 The first sentence of the second to last paragraph is revised to read: <br /> 31 <br /> 32 Assembly and installation of Beam Guardrail Non-flared Terminals for Type 31 guardrail <br /> 33 shall be supervised at all times by a manufacturer's representative, or an installer who has <br /> I 34 been trained and certified by the manufacturer. <br /> 35 <br /> 36 The last paragraph is revised to read: <br /> I 37 <br /> 38 Beam Guardrail Non-flared Terminals for Type 31 guardrail shall meet the crash test and <br /> 39 evaluation criteria in the Manual for Assessing Safety Hardware (MASH). <br /> I 40 <br /> 41 8-11.4 Measurement <br /> 42 The third paragraph is revised to read: <br /> 43 <br /> 1 44 Measurement of beam guardrail terminal will be per each for the completed terminal. <br /> 45 <br /> 46 The fourth paragraph is revised to read: <br /> 1 47 <br /> I City of EverettPage AM-109 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.