Laserfiche WebLink
1 <br /> 1 Measurement of beam guardrail Type 31 buried terminal Type 2 will bep er linear foot for <br /> 2 the completed terminal. <br /> 3 <br /> 4 The sixth paragraph is revised to read: <br /> 5 <br /> 6 Measurement of beam guardrail anchor Type 10 will be per each for the completed anchor, I 7 including the attachment of the anchor to the guardrail. <br /> 8 <br /> 9 8-11.5 Payment <br /> 10 The Bid item "Beam Guardrail Anchor Type ", per each is revised to read "Beam Guardrail <br /> 11 Anchor Type 10", per each. <br /> 12 <br /> 13 The Bid item "Beam Guardrail Buried Terminal Type 1", per each is deleted from this section. 1 <br /> 14 <br /> 15 The Bid item "Beam Guardrail Buried Terminal Type 2", per linear foot and the following <br /> 16 paragraph are revised to read: <br /> 17 <br /> 18 "Beam Guardrail Type 31 Buried Terminal Type 2", per linear foot. <br /> 9 <br /> 2 <br /> 20 The unit Contract price per linear foot for "Beam Guardrail Type 31 Buried Terminal Type 2" <br /> 21 shall be full payment for all costs to obtain and provide materials and perform the Work as <br /> 22 described in Section 8-11.3(1)C. <br /> 23 <br /> I <br /> 24 Section 8-14, Cement Concrete Sidewalks <br /> 25 April 2, 2018 <br /> 26 8-14.2 Materials I <br /> 27 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 28 <br /> 29 Cement 9-01 <br /> 30 <br /> 31 In the second paragraph, each reference to "Federal Standard 595" is revised to read "SAE <br /> 32 AMS Standard 595". <br /> 33 <br /> 34 Section 8-16, Concrete Slope Protection <br /> 35 April 2, 2018 1 <br /> 36 8-16.2 Materials <br /> 37 In the first paragraph, the last two material references are revised to read: <br /> 38 <br /> 39 Poured Portland Cement or Blended Hydraulic Cement <br /> 40 Concrete Slope Protection 9-13.5(2) <br /> 41 Pneumatically Placed Portland Cement or Blended <br /> 42 Hydraulic Cement Concrete Slope Protection 9-13.5(3) <br /> 43 <br /> 44 Section 8-17, Impact Attenuator Systems <br /> 45 January 7, 2019 <br /> 46 8-17.3 Construction Requirements I <br /> 47 This section is supplemented with the following: <br /> City of Everett Page AM-110 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />