My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> 2 Permanent impact attenuators shall meet the crash test and evaluation criteria of the <br /> 3 Manual for Assessing Safety Hardware (MASH), except as otherwise noted in the Plans or <br /> 4 Special Provisions. <br /> 5 <br /> 6 Section 8-20, Illumination, Traffic Signal Systems, Intelligent Transportation <br /> 7 Systems, and Electrical <br /> 8 August 6, 2018 <br /> 9 8-20.1(1) Regulations and Code <br /> 10 The last paragraph is revised to read: <br /> 11 <br /> 12 Persons performing electrical Work shall be certified in accordance with and supervised as <br /> 13 required by RCW 19.28.161. Proof of certification shall be worn at all times in accordance <br /> 14 with WAC 296-46B-942. Persons failing to meet these certification requirements may not <br /> 15 perform any electrical work, and shall stop any active electrical work, until their certification <br /> 16 is provided and worn in accordance with this Section. <br /> 17 <br /> 18 8-20.2(2) Equipment List and Drawings <br /> 19 This section is renumbered: <br /> 20 <br /> 21 8-20.2(1) Equipment List and Drawings <br /> 22 <br /> 23 8-20.3(4) Foundations <br /> 24 The second sentence of the first paragraph is revised to read: <br /> 25 <br /> 26 Concrete for Type II, Ill, IV, V, and CCTV signal standards and light standard foundations <br /> 27 shall be Class 4000P and does not require air entrainment. <br /> I 28 <br /> 29 8-20.3(5)A General <br /> 30 The last two sentences of the last paragraph is deleted. <br /> 31 <br /> 32 This section is supplemented with the following: <br /> 33 <br /> 34 All conduits shall include a pull tape with the equipment grounding conductor. The pull tape <br /> 35 shall be attached to the conduit near the end bell or grounded end bushing, or to duct plugs <br /> 36 or caps if present, at both ends of the conduit. <br /> 37 <br /> 38 8-20.3(8) Wiring <br /> 39 The seventeenth paragraph is supplemented with the following: <br /> 40 <br /> 1 41 <br /> 42 Pulling tape shall meet the requirements of Section 9-29.1(10). Pull string may not be used. <br /> 43 8-20.3(14)C Induction Loop Vehicle Detectors <br /> 44 Item number 2 is deleted. <br /> 45 <br /> 46 Item numbers 3 through 12 are renumbered to 2 through 11, respectively. <br /> 47 <br /> i <br /> 1 City of Everett Page AM 111 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.