Laserfiche WebLink
I <br /> 1 Section 8-21, Permanent Signing <br /> 9 g <br /> 2 January 7 2019 <br /> 3 8-21.3(5) Sign Relocation <br /> 4 The second sentence of the first paragraph is revised to read: <br /> 5 <br /> 6 Where the existing sign Structure is mounted on concrete pedestals, the Contractor shall <br /> 7 remove the pedestal to a minimum of 2 feet below finished grade and backfill the remaining <br /> 8 hole with material similar to that surrounding the hole. <br /> 9 <br /> 10 8-21.3(9)F Foundations <br /> 11 Item number 3 of the twelfth paragraph is supplemented with the following new sentence: <br /> 12 <br /> 13 Class 4000P concrete for roadside sign structures does not require air entrainment. <br /> 14 <br /> 15 Section 8-22, Pavement Marking I <br /> 16 January 7, 2019 <br /> 17 8-22.3(2) Preparation of Roadway Surfaces <br /> 18 The second paragraph is revised to read: <br /> 19 <br /> 20 Remove all other contaminants from pavement surfaces that may adversely affect the <br /> 21 installation of new pavement marking. <br /> 22 <br /> 23 8-22.3(3)F Application Thickness <br /> 24 The second to last sentence of the last paragraph is revised to read: <br /> 25 <br /> 26 After grinding, clean the groove. <br /> 27 1 28 <br /> 29 Section 9-00, Definitions and Tests <br /> 30 January 7, 2019 I <br /> 31 9-00.4 Sieves for Testing Purposes <br /> 32 This section is revised to read: <br /> 33 <br /> 34 Test sieves shall be made of either: (1) woven wire cloth conforming to ASTM E11, or (2) <br /> 35 square-hole, perforated plates conforming to ASTM E323. <br /> 36 <br /> 37 9-00.7 Galvanized Hardware, AASHTO M 232 <br /> 38 The first sentence is revised to read: <br /> 39 <br /> 40 An acceptable alternate to hot-dip galvanizing in accordance with AASHTO M 232 will be <br /> 41 zinc coatings mechanically deposited in accordance with ASTM B695, providing the <br /> 42 minimum thickness of zinc coating is not less than that specified in AASHTO M 232, and <br /> 43 the process will not produce hydrogen embrittlement in the base metal. <br /> 44 <br /> I <br /> City of Everett Page AM-112 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />