My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1-05.9 Equipment <br /> 2 The following new paragraph is inserted before the first paragraph: <br /> 3 <br /> 4 Prior to mobilizing equipment on site, the Contractor shall thoroughly remove all loose dirt <br /> 5 and vegetative debris from drive mechanisms, wheels, tires, tracks, buckets and <br /> 6 undercarriage. The Engineer will reject equipment from the site until it returns clean. <br /> 7 <br /> 8 This section is supplemented with the following: <br /> 9 <br /> 10 Upon completion of the Work, the Contractor shall completely remove all loose dirt and <br /> 11 vegetative debris from equipment before removing it from the job site. <br /> 12 <br /> 13 Section 1-06, Control of Material <br /> 14 January 7, 2019 <br /> 15 1-06.1(3) Aggregate Source Approval (ASA) Database <br /> 16 This section is supplemented with the following: <br /> 17 <br /> 18 Regardless of status of the source, whether listed or not listed in the ASA database the <br /> 19 source owner may be asked to provide testing results for toxicity in accordance with <br /> 20 Section 9-03.21(1). <br /> 21 <br /> 22 1-06.2(2)D Quality Level Analysis <br /> 23 This section is supplemented with the following new subsection: <br /> 24 <br /> 25 1-06.2(2)D5 Quality Level Calculation — HMA Compaction I <br /> 26 The procedures for determining the quality level and pay factor for HMA compaction are as <br /> 27 follows: <br /> 28 <br /> 29 1. Determine the arithmetic mean, Xm, for compaction of the lot: <br /> 30 <br /> 31 X = fix <br /> n <br /> 32 <br /> 33 Where: <br /> 34 x = individual compaction test values for each sublot in the lot. <br /> 35 Zx= summation of individual compaction test values <br /> 36 n = total number test values <br /> 37 <br /> 38 2. Compute the sample standard deviation, "S", for each constituent: <br /> 39 <br /> 1 <br /> 2 <br /> nXx2-(I,x) 2 <br /> 40 S= <br /> n(n-1) <br /> 41 111 <br /> 42 Where: <br /> 43 >Tx2= summation of the squares of individual compaction test values <br /> 44 (>x)2 = summation of the individual compaction test values squared <br /> City of Everett Page AM-4 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.