I <br /> 1 Work. The Contractor shall perform the Work according to these supplemental Drawings <br /> 2 and explanations. <br /> I 3 <br /> 4 In addition to supplemental Drawings furnished by the Engineer, the Contract Documents <br /> 5 may also be supplemented by Shop Drawings prepared by the Contractor, material <br /> I <br /> 6 <br /> 7 supplier, or manufacturer, when necessary or as required by the Contract Documents to <br /> detail and illustrate portions of the Work. Shop Drawings shall be reviewed by the Engineer <br /> 8 before any Work pursuant to those Shop Drawings is performed. Shop Drawings may <br /> 9 include, but may not be limited to: shop details; erection plans; masonry lay-out diagrams; <br /> I <br /> 10 reinforcing steel and bending diagrams; post tensioning plans; shoring, cribbing, cofferdam, <br /> 11 or falsework plans; formwork plans, or hydraulic items. Catalog cuts or Standard Plans for <br /> 12 commonly used manufactured items will be considered as Shop Drawings. <br /> I 13 <br /> 14 Unless otherwise requested by the Engineer, the Contractor shall submit six (6) complete <br /> 15 sets of Shop Drawings directly to the Engineer for review and approval. If the Design <br /> I 16 Engineer is a full time employee of the City, the Contractor may expect ten (10) working <br /> 17 days from submission for review and return of comments. If the Design Engineer is not a <br /> 18 full time employee of the City, the Contractor should expect thirty calendar days from <br /> 19 submission for review and return of comments. The Engineer may extend this time for <br /> I <br /> 20 good cause by notifying the Contractor. The Engineer will check and return three (3) copies <br /> 21 of such Drawings. On all submittals of a Drawing after the Drawing's initial submittal and <br /> 22 return, the Contractor shall: make any corrections required by the Engineer; expressly and <br /> I <br /> 23 <br /> 24 explicitly notify the Engineer in writing of any and all deviations from the Specifications and <br /> all revisions other than the corrections called for by the Engineer on previous submittals; <br /> 25 and return three (3) corrected copies of the Drawings for the Engineer's further review. The <br /> I 26 Contractor shall plan on at least ten (10) working days from the date of Engineer's receipt <br /> 27 for the Engineer's review, comment, and return of submitted Drawings. Some Shop <br /> 28 Drawings may require more than six (6) copies. The Contractor shall furnish additional <br /> 29 copies when requested. <br /> I <br /> 30 <br /> 31 The Contractor shall be fully responsible for the accuracy of dimensions and details on <br /> 32 Shop Drawings, and for complete conformity with the Contract Documents, even if the <br /> I <br /> 33 <br /> 34 Shop Drawings have been approved by the Engineer, or if the Contractor and the Engineer <br /> agree on dimensions and details. The City does not accept Shop Drawings as accurate or <br /> 35 adequate, and does not take responsibility for, or warrant that Shop Drawings will meet <br /> I <br /> 36 Contract requirements. <br /> 37 <br /> 38 The Engineer's review of Shop Drawings shall not relieve Contractor from responsibility for <br /> 39 any variation from the requirements of the Contract Documents unless the Contractor has <br /> I 40 in writing called the Engineer's attention to each such variation at the time of submission, <br /> 41 and the Engineer has given written approval of each such variation by a specific written <br /> 42 notation thereof incorporated in or accompanying the returned Shop Drawing; nor will any <br /> I 43 review by Engineer relieve Contractor from responsibility for errors or omissions in the <br /> 44 Shop Drawings or from responsibility for having complied with the provisions of this <br /> 45 Section. <br /> I 46 <br /> 47 The Bid prices shall include all costs for furnishing Shop Drawings and submittals. <br /> 48 <br /> 49 Deviations from Standard Plans will be subject to a Shop Drawing submitted by the <br /> I <br /> 50 Contractor and approved by the Engineer. Where a Shop Drawing is required by the <br /> I City of Everett Page SP1 21 Special Provisions <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />