Laserfiche WebLink
I <br /> offsets 0.1 ft. All angle changes. <br /> Forcemains, Coordinates I.E. 0.1 ft. Record all angle points and <br /> watermains and and stations finished ground elev. Above <br /> transmission lines 0.1 ft. the invert elev. <br /> All other items, incl. 0.1 ft. 0.1 ft. Show dimensions on Record <br /> Electrical and Drawings. <br /> I <br /> Structural <br /> 1 <br /> 2 C. Use red pen or pencil to make changes on the Record Drawings. Notations are to be <br /> 3 neat, legible, clear and concise. <br /> 4 D. Record information concurrently with the progress of construction. Conceal no Work <br /> 5 until the required information is verified and recorded. <br /> I <br /> 6 <br /> 7 1-05.20(3) Payment <br /> 8 Payment will be made for the following bid item: I <br /> Minimum Bid Required —Record Drawings $3000 Lump Sum <br /> (Minimum Bid <br /> I <br /> $3000) <br /> 9 <br /> 10 Payment for this item will be made on a prorated monthly basis for work completed in <br /> I <br /> 11 accordance with this section up to 75% of the lump sum bid. The final 25% of the lump <br /> 12 sum item will be paid upon submittal and approval of the completed Record Drawings set <br /> 13 prepared in conformance with these Special Provisions. I <br /> 14 A minimum bid amount has been entered in the Bid Proposal for this item. The Contractor <br /> 15 must bid at least that amount. <br /> 16 <br /> 17 <br /> 18 1-06 Control of Material I <br /> 19 Supplement Section 1-06 as follows: <br /> 20 <br /> 21 References to materials shall also mean Contractor-furnished equipment, if any, as <br /> 22 specified in these Special Provisions. <br /> 23 <br /> 24 1-06.1 Approval of Materials Prior to Use <br /> 25 Revise the first paragraph of Section 1-06.1 to read as follows: <br /> 26 <br /> 27 Prior to use, the Contractor shall notify the Engineer of all proposed materials. The <br /> 28 Contractor may use the Qualified Product List (QPL) and the Aggregate Source Approval <br /> 29 (ASA) Database. The Contractor shall use the Request for Approval of Material (RAM) <br /> 30 form. <br /> 31 <br /> I <br /> 32 Supplement 1-06.1 by adding the following: <br /> 33 <br /> 34 Provide product data, when specified, in accordance with Section 1-05.3(1) Submittals of <br /> I <br /> 35 these Special Provisions for inspecting, testing, operating, or maintaining Equipment and <br /> 36 materials supplied as part of the Work. Unless otherwise specified, such data shall be <br /> City of Everett Page SP1-36 Special Provisions <br /> I <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />