My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 <br /> 2 2. Procedure for implementation of corrective action for non-conformance work. <br /> 13 <br /> 4 3. The paint system manufacturer's recommended methods of preventing defects. <br /> 5 <br /> I 6 4. The Contractor's frequency of quality control inspection for each phase of work. <br /> 7 <br /> 8 5. Example of each completed form(s) of the daily quality control report used to document <br /> 9 the inspection work and tests performed by the Contractor's quality control personnel. <br /> I 10 <br /> 11 6-07.3(2)C Paint System Manufacturer and Paint System Information Submittal <br /> 12 Component <br /> I 13 Item number 1 is revised to read: <br /> 14 <br /> 15 1. Product data sheets and Safety Data Sheets (SDS) on the paint materials, paint <br /> I 16 preparation, and paint application, as specified by the paint manufacturer, including: <br /> 17 <br /> 18 a. All application instructions, including the mixing and thinning directions. <br /> I 19 <br /> 20 b. Recommended spray nozzles and pressures. <br /> 21 <br /> 22 c. Minimum and maximum drying time between coats. <br /> 111 23 <br /> 24 d. Restrictions on temperature and humidity. <br /> 25 <br /> I 26 e. Repair procedures for shop and field applied coatings. <br /> 27 <br /> 28 f. Maximum dry film thickness for each coat. <br /> I 29 <br /> 30 g. Minimum wet film thickness for each coat to achieve the specified minimum dry <br /> 31 film thickness. <br /> 32 <br /> 1 33 6-07.3(2)D Hazardous Waste Containment, Collection, Testing, and Disposal <br /> 34 Submittal Component <br /> 35 The first paragraph (up until the colon) is revised to read: <br /> I 36 <br /> 37 The hazardous waste containment, collection, testing, and disposal shall meet all Federal <br /> 38 and State requirements, and the submittal component of the painting plan shall include the <br /> I 39 following: <br /> 40 <br /> 41 6-07.3(2)E Cleaning and Surface Preparation Submittal Component <br /> I 42 Item 1(b) of the first paragraph is revised to read:: <br /> 43 <br /> 44 b. Type, manufacturer, and brand of abrasive blast material and all associated additives, <br /> 45 including Safety Data Sheets (SDS). <br /> I 46 <br /> 47 6-07.3(3)B Quality Control and Quality Assurance for Field Application of Paint <br /> 48 The last sentence of the first paragraph (excluding the numbered list) is revised to read: <br /> 1 49 <br /> I City of Everett Page AM 45 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.