My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> II 1 <br /> 2 Primer Coat—Zinc-filled Moisture Cured Polyurethane 9-08.1(2)F <br /> I 3 Primer Stripe Coat- Moisture Cured Polyurethane 9-08.1(2)F <br /> 4 Intermediate Coat- Moisture Cured Polyurethane 9-08.1(2)G <br /> 5 Intermediate Stripe Coat- Moisture Cured Polyurethane 9-08.1(2)G <br /> I 6 Top Coat- Moisture Cured Polyurethane 9-08.1(2)H <br /> 7 <br /> 8 Option 2 (performance based system): <br /> 9 <br /> I10 Primer Coat—Zincrich Epoxy 9-08.1(2)N <br /> 11 Primer Stripe Coat— Epoxy 9-08.1(2)N <br /> 12 Intermediate Coat— Epoxy 9-08.1(2)N <br /> I 13 Intermediate Stripe Coat— Epoxy 9-08.1(2)N <br /> 14 Top Coat— Polyurethane 9-08.1(2)N <br /> 15 <br /> I 16 The following new paragraph is inserted after the first paragraph: <br /> 17 <br /> 18 Paints and related materials shall be a product listed in the current WSDOT Qualified <br /> 19 Products List (QPL). Component based paint systems shall be listed on the QPL in the <br /> I20 applicable sections of Section 9-08. Performance based systems shall be listed on the <br /> 21 current Northeast Protective Coatings Committee (NEPCOAT) Qualified Products List "B" <br /> 22 as listed on the WSDOT QPL in Section 9-08.1(2)N. If the paint and related material for the <br /> I 23 component based system is not listed in the current WSDOT QPL, a sample shall be <br /> 24 submitted to the State Materials Laboratory in Tumwater for evaluation and acceptance in <br /> 25 accordance with Section 9-08. <br /> 126 <br /> 27 6-07.3(10)J Mixing and Thinning Paint <br /> 28 This section is revised to read: <br /> 29 <br /> I30 Mixing and thinning paint shall be in accordance with Section 6-07.3(9)C. <br /> 31 <br /> 32 6-07.3(10)K Coating Thickness <br /> I <br /> 33 This section is revised to read: <br /> 34 <br /> 35 Coating thickness shall be in accordance with Section 6-07.3(9)D except the minimum dry <br /> I 36 film thickness of each coat (combination of primer and primer stripe, combination of <br /> 37 intermediate and intermediate stripe, and top) shall not be less than 3.0 mils. <br /> 38 <br /> I <br /> 39 6-07.3(10)L Environmental Condition Requirements Prior to Application of Paint <br /> 40 This section is revised to read: <br /> 41 <br /> 42 Environmental conditions shall be in accordance with Section 6-07.3(9)E. <br /> 43 <br /> 44 6-07.3(10)M Steel Surface Condition Requirements Prior to Application of Paint <br /> 45 The third paragraph is revised to read: <br /> I 46 <br /> 47 Edges of existing paint shall be feathered in accordance with SSPC-PA 1, Shop, Field, and <br /> 48 Maintenance Coating of Metals, Note 15.20. <br /> 1 <br /> 49 <br /> ' City of EverettPage AM-53 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.