My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 2. 70 percent of the bid amount will be paid in accordance with Section 1-09.9. <br /> 2 <br /> 3 3. Once the project is physically complete and copies of the all reports submitted <br /> 4 to the Washington State Department of Ecology have been submitted to the <br /> 5 Engineer, and, if applicable, transference of the CSWGP back to the <br /> 6 Contracting Agency is complete, the remaining 15 percent of the bid amount <br /> 7 shall be paid in accordance with Section 1-09.9. <br /> 8 <br /> 9 8-01.5(2) Item Bids <br /> 10 "ESC Lead", per day. <br /> 11 <br /> 12 "Turbidity Curtain", per linear foot. <br /> 13 <br /> 14 "Erosion Control Blanket", per square yard. <br /> 15 <br /> 16 "Plastic Covering", per square yard. <br /> 17 <br /> 18 "Check Dam", per linear foot. <br /> 19 <br /> 20 "Inlet Protection", per each. <br /> 21 <br /> 22 "Gravel Filter Berm", per linear foot. <br /> 23 <br /> 24 "Stabilized Construction Entrance", per square yard. <br /> 25 <br /> 26 "Street Cleaning", per hour. <br /> 27 <br /> 28 "Silt Fence", per linear foot. <br /> 29 <br /> 30 "Wood Chip Berm", per linear foot. <br /> 31 <br /> 32 "Compost Berm", per linear foot. <br /> 33 <br /> 34 "Wattle", per linear foot. <br /> 35 <br /> 36 "Compost Sock", per linear foot. <br /> 37 <br /> 38 "Coir Log", per linear foot. <br /> 39 <br /> 40 "Temporary Curb", per linear foot. <br /> 41 <br /> 42 "Temporary Pipe Slope Drain", per linear foot. <br /> 43 <br /> 44 "Temporary Seeding", per acre. <br /> 45 <br /> 46 "Temporary Mulching", per acre. <br /> 47 <br /> 48 "Compost Blanket", per square yard. <br /> 49 <br /> 50 "Outlet Protection", per each. <br /> 51 <br /> City of Everett Page AM-84 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.