My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 1 <br /> 2 "Turbidity Curtain", per linear foot. <br /> 3 <br /> 4 "Erosion Control Blanket", per square yard. <br /> 1 5 <br /> 6 "Plastic Covering", per square yard. <br /> 7 <br /> I 8 "Check Dam", per linear foot. <br /> 9 <br /> 10 "inlet Protection", per each. <br /> I 11 <br /> 12 "Gravel Filter Berm", per linear foot. <br /> 13 <br /> 14 "Stabilized Construction Entrance", per square yard. <br /> I 15 <br /> 16 "Street Cleaning", per hour. <br /> 17 <br /> I 18 "Silt Fence", per linear foot. <br /> 19 <br /> 20 "Wood Chip Berm", per linear foot. <br /> I 21 <br /> 22 "Compost Berm", per linear foot. <br /> 23 <br /> 24 "Wattle", per linear foot. <br /> I 25 <br /> 26 "Compost Sock", per linear foot. <br /> 27 <br /> I 28 "Coir Log", per linear foot. <br /> 29 <br /> 30 "Temporary Curb", per linear foot. <br /> I 31 <br /> 32 "Temporary Pipe Slope Drain", per linear foot. <br /> 33 <br /> 34 "Temporary Seeding", per acre. <br /> I 35 <br /> 36 "Temporary Mulching", per acre. <br /> 37 <br /> 38 "Compost Blanket'', per square yard. <br /> I 39 <br /> 40 "Outlet Protection", per each. <br /> I 41 <br /> 42 "Tackifier", per acre. <br /> 43 <br /> 44 "Erosion/Water Pollution Control", by force account as provided in Section 1-09.6. <br /> I 45 <br /> 46 Maintenance and removal of erosion and water pollution control devices including removal <br /> 47 and disposal of sediment, stabilization and rehabilitation of soil disturbed by these <br /> I 48 activities, and any additional Work deemed necessary by the Engineer to control erosion <br /> 49 and water pollution will be paid by force account in accordance with Section 1-09.6. <br /> 50 <br /> 51 To provide a common Proposal for all Bidders, the Contracting Agency has entered an <br /> 52 amount in the Proposal to become a part of the Contractor's total Bid. <br /> iCITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> ISTATE FUND#HLP PB17(014); COE#PW3688 Page AM-83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.