My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> i 1 <br /> 2 Seed applied as a separate operation using a hydroseeder shall have a tracer <br /> 3 added to visibly aid uniform application. The tracer shall be HECP Short Term <br /> 4 Mulch applied at a rate of 200 to 250 pounds per acre and the tracer shall carry <br /> I 5 the measured specified seeding rate. <br /> 6 <br /> 7 8-O2.3(9)C Seeding with Fertilizers and Mulches <br /> I 8 When the Proposal includes any variation of seeding, fertilizing, and without <br /> 9 mulching, the seed and fertilizer shall be applied in one application followed by <br /> 10 mulching. West of the Cascade Mountains, seed, fertilizer, and mulch may be <br /> 11 completely applied in one application. East of the Cascades. seeding, fertilizing, <br /> 12 and mulching shall not be applied as a single application unless allowed by the <br /> 13 Engineer in writing prior to application. The fertilizing and mulching shall meet <br /> 14 the requirements of Sections 8-02.3(6) and 8-02.3(11). <br /> I 15 <br /> 16 8-O2.3(9)D Inspection <br /> 17 Seeded areas will be inspected upon completion of seeding, fertilizing, and <br /> I 18 mulching. The Work in any area will not be measured for payment until a uniform <br /> 19 distribution of the materials is accomplished at the specified rate.Areas that have <br /> 20 not received a uniform application of seed, fertilizer, and mulch at the specified <br /> I 21 rate, as determined by the Engineer, shall be re-seeded, re-fertilized, or re- <br /> 22 mulched prior to payment for seeding within a designated area. <br /> �� <br /> 24 8-O2.3(9)E Protection and Care of Seeded Areas <br /> I 25 The Contractor shall install and establish a stable and weed free stand of grass <br /> 26 as specified within all designated permanent seeding areas. A stable stand of <br /> 27 grass shall meet the following requirements: <br /> I 28 <br /> 29 1. A dense and uniform canopy cover, 70% for Western Washington and <br /> 30 5O% for Eastern Washington, of specified species covers all seeded <br /> 31 areas after 3 months of active growth following germination during the <br /> 32 growing season. Canopy cover is defined as the cover of living and <br /> 33 vigorous grass blades, leaves, and shoots of specified species. <br /> 34 Volunteer species, weeds, woody plants, or other undesirable <br /> I 35 vegetation shall not factor into the canopy cover. Growth and <br /> 36 establishment may require supplemental irrigation to meet cover <br /> 37 requirements. <br /> I 38 <br /> 39 2. Stand health is evident by vigorously growing planted species having a <br /> 40 uniform rich-green appearance and with no dead patches or major gaps <br /> I 41 of growth.A stand of grass that displays rusting, wilting, stunted growth, <br /> 42 disease, yellowing or browning of leaves, or bare patches does not <br /> 43 meet the stand health requirement. <br /> 44 <br /> I <br /> 45 <br /> 46 3. The Contractor shall establish a stable stand of grass free of all weeds, <br /> non-specified grasses, and other undesirable vegetation. Weed control <br /> 47 shall be in accordance with the Weed and Pest Control Plan and occur <br /> I 48 on a monthly basis during the establishment period and through the life <br /> 49 of the Contract. <br /> 50 <br /> 111 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> ISTATE FUND#HLP PB17(014); COE#PW3688 Page AM-95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.