My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 installation requirements. The Contractor shall replace all plants and associated <br /> 2 materials rejected or missing and correct unsatisfactory conditions. <br /> 3 <br /> 4 Completion of the initial planting within a designated area includes the following <br /> I <br /> 5 <br /> 6 conditions: <br /> 7 1. 100 percent of each of the plant material categories are installed as shown <br /> I 8 in the Plans. <br /> 9 <br /> 10 2. Planting Area is cleaned up. <br /> I 11 <br /> 12 3. Repairs are completed, including but not limited to, full operation of the <br /> 13 irrigation system. <br /> 14 <br /> I 15 4. Mulch coverage is complete. <br /> 16 <br /> 17 5. All weeds are controlled. <br /> I 18 <br /> 19 8-02.3(13) Plant Establishment <br /> 20 Plant establishment consists of caring for all plants and planting areas within the <br /> I 21 project limits. The provisions of Sections 1-07.13(2) and 1-07.13(3) do not apply to <br /> 22 this Section. <br /> 23 <br /> 24 When the Proposal includes the bid item PSIPE (Plant Selection Including Plant <br /> I 25 Establishment), that bid item includes one year of plant establishment Work. The first <br /> 26 year of plant establishment shall begin immediately upon written notification from the <br /> 27 Engineer of the completion of initial planting for the project. The first-year plant <br /> I 28 establishment period shall be a minimum of one calendar year. The one calendar <br /> 29 year shall be extended an amount equal to any periods where the Contractor does <br /> 30 not comply with the plant establishment requirements and plan. <br /> I 31 <br /> 32 During the first-year plant establishment period, the Contractor shall perform all Work <br /> 33 necessary to ensure the resumption and continued growth of the transplanted <br /> 34 material. This Work shall include, but is not limited to, applying water, removing <br /> I 35 foreign, dead, or rejected plant material, maintaining all planting areas in a weed-free <br /> 36 condition, and replacing all unsatisfactory plant material planted under the Contract. <br /> 37 If plants are stolen or damaged by the acts of others, the Contracting Agency will pay <br /> I 38 invoice cost only for the replacement plants with no mark-up and the Contractor will <br /> 39 be responsible for the labor to install the replacement plants. Other weed control <br /> 40 within the project limits but outside of planting, lawn, or seeding areas shall be as <br /> I 41 specified in Section 8-02.3(3)C. <br /> 42 <br /> 43 During the first year of plant establishment, the Contractor shall meet monthly or at <br /> 44 an agreed upon schedule with the Engineer for the purpose of joint inspection of the <br /> I 45 planting material. The Contractor shall correct all unsatisfactory conditions identified <br /> 46 by the Engineer within a 10-day period immediately following the inspection. If plant <br /> 47 replacement is required, the Contractor shall, within the 10-day period, submit a plan <br /> I 48 and schedule for the plant procurement and replacement to occur during the planting <br /> 49 period as designated in Section 8-02.3(8). At the end of the plant establishment <br /> 50 period, plants that do not show normal growth shall be replaced and all staking and <br /> I <br /> 51 <br /> 52 guying that remain on the project shall be removed unless otherwise allowed by the <br /> Engineer. <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> ISTATE FUND#HLP PB17(014);COE#PW3688 Page AM-99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.