Laserfiche WebLink
I <br /> 1 planting area preparation; planting, cleanup, and water necessary to complete <br /> 2 planting operations as specified to the end of first year plant establishment. <br /> 3 <br /> 4 As the plants that include plant establishment are obtained, propagated, and grown, <br /> I 5 partial payments will be made as follows after inspection by the Engineer: <br /> 6 <br /> 7 Payment of 5 percent of the unit Contract price, per each, when the plant <br /> I 8 materials have been contracted, propagated, and are growing under nursery <br /> 9 conditions. The Contractor shall provide the Engineer with certification that the <br /> 10 plant material has been procured or contracted for delivery to the project for <br /> 11 planting within the time limits of the project. The certification shall state the <br /> 12 location, quantity, and size of all material. <br /> 13 <br /> 14 Payment will be increased to 15 percent of the unit Contract price, per each, <br /> 15 upon completion of the initial weed control and planting area preparation Work. <br /> 16 <br /> 17 Payment will be increased to 60 percent of the unit Contract price per each for <br /> I 18 the contracted plant material in a designated unit area when planted. <br /> 19 <br /> 20 Payment will be increased to 70 percent of the unit Contract price per each for <br /> 21 contracted plant material at the completion of the initial planting. <br /> I 22 <br /> 23 Payment will be increased to the appropriate percentage upon reaching the <br /> 24 following plant establishment milestones: <br /> I 25 <br /> 26 June 30th 80 percent <br /> 27 <br /> I 28 September 30th 90 percent <br /> 29 <br /> 30 Completion of first-year plant establishment or after all 100 percent <br /> 31 replacement plants have been installed, whichever is <br /> 1 32 later. <br /> 33 <br /> 34 Plant establishment milestones are achieved when planting areas meet <br /> I <br /> 35 conditions described in Section 8-02.3(13). <br /> 36 <br /> 37 "Seeding, Fertilizing and Mulching", per acre. <br /> I 38 <br /> 39 "Seeding and Fertilizing", per acre or per square yard. <br /> 40 <br /> 41 "Seeding and Fertilizing by Hand", per square yard. <br /> I 42 <br /> 43 "Second Application of Fertilizer", per acre. <br /> 44 <br /> I <br /> 45 "Seeding and Mulching", per acre. <br /> 46 <br /> 47 "Seeded Lawn Installation", per square yard. <br /> I <br /> 48 <br /> 49 "Sod Installation", per square yard. <br /> "Lawn Mowing". per square yard. <br /> 50 The unit Contract price per square yard for "Seeded Lawn Installation" or "Sod <br /> 1 51 Installation" shall be full pay for all costs necessary to prepare the area, plant or sod <br /> 52 the lawn, erect barriers, control weeds, and establish lawn areas and for furnishing <br /> 1 CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-105 <br />