I <br /> 1 Parallel to Roadway Surface Over the ± 0.50 inch max 1.00 inch max <br /> 1 Length of the Bar <br /> 1 <br /> 2 Dowel bars and tie bars shall be placed according to the Standard Plan when multiple <br /> I 3 panels are placed. Panels shall be cast separately from the bridge approach slab. <br /> 4 <br /> 5 Dowel bars to be drilled into existing concrete or at a new transverse contraction joint shall <br /> I <br /> 6 <br /> 7 have a parting compound, such as curing compound, grease, or other Engineer accepted <br /> equal, applied to them prior to placement. <br /> 8 <br /> I <br /> 9 Clean the drilled holes in accordance with the epoxy or grout manufacturer's instructions. <br /> 10 Holes shall be clean and dry at the time of placing the epoxy, or grout and tie bars. <br /> 11 Completely fill the void between the tie bar and the outer limits of the drilled hole with <br /> 12 epoxy or grout. Use retention rings to prevent leakage of the epoxy or grout and support <br /> I <br /> 13 the tie bar to prevent movement until the epoxy or grout has cured the minimum time <br /> 14 recommended by the manufacturer. <br /> 15 <br /> I <br /> 16 <br /> 17 5-01.3(4)D Foundation Preparation <br /> The Contractor shall smooth the surfacing below the removed panel and compact it to the <br /> 18 satisfaction of the Engineer. Crushed surfacing base course, or hot mix asphalt may be <br /> I19 needed to bring the surfacing to grade prior to placing the new concrete. <br /> 20 <br /> 21 If the material under the removed panel is uncompactable and the Engineer requires it, <br /> 22 the Contractor shall excavate the Subgrade 2 feet, place a soil stabilization construction <br /> I <br /> 23 geotextile meeting the requirements of Section 9-33, and backfill with crushed surfacing <br /> 24 base course. This Work may include: <br /> 25 <br /> I 26 1. Furnishing and hauling crushed surfacing base course to the project site. <br /> 27 <br /> 28 2. Excavating uncompactable material. <br /> I 29 <br /> 30 3. Furnishing and placing a soil stabilization construction geotextile. <br /> 31 <br /> 32 4. Backfilling and compacting crushed surfacing base course. <br /> I 33 <br /> 34 5. Removing, hauling and restocking any unused crushed surfacing base course. <br /> 35 <br /> I 36 5-01.3(4)E Concrete Finishing <br /> 37 Grade control shall be the responsibility of the Contractor. <br /> 38 <br /> I 39 All panels shall be struck off level with the adjacent panels and floated to a smooth surface. <br /> 40 <br /> 41 Final finish texturing shall meet the requirements of Section 5-05.3(11). <br /> 42 <br /> I 43 In areas where the Plans do not require grinding, the surface smoothness will be <br /> 44 measured with a 10-foot straightedge by the Engineer in accordance with Section 5- <br /> 45 05.3(12). If the replacement panel is located in an area that will be ground as part of <br /> I 46 concrete pavement grinding in accordance with Section 5-01.3(9), the surface <br /> 47 smoothness shall be measured, by the Contractor, in conjunction with the smoothness <br /> 48 measurement done in accordance with Section 5-01.3(10). <br /> I 49 <br /> 1 CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> I <br /> STATE FUND#HLP PBI7(014); COE#PW3688 Page AM-15 <br />