Laserfiche WebLink
I <br /> I 1 6-07.3(3)B Quality Control and Quality Assurance for Field Application of Paint <br /> 2 The last sentence of the first paragraph (excluding the numbered list) is revised to read: <br /> 3 <br /> 4 The Contractor's quality control operations shall include a minimum monitoring and <br /> I <br /> 5 documenting the following for each working day: <br /> 6 <br /> 7 Item number 1 in the fourth paragraph is revised to read: <br /> I 8 <br /> 9 1. Environmental conditions for painting in accordance with ASTM E 337. <br /> 10 <br /> 11 Item number 4 in the fourth paragraph is revised to read: <br /> 12 <br /> 13 4. Pictorial of surface preparation guides in accordance with SSPC-VIS 1, 3, 4, and 5. <br /> 14 <br /> I 15 Item number 5 in the fourth paragraph is revised to read: <br /> 16 <br /> 17 5. Surface profile by Keanne-Tator comparator in accordance with ASTM D 4417 and <br /> I 18 SSPC PA17. <br /> 19 <br /> 20 6-07.3(4) Paint System Manufacturer's Technical Representative <br /> I 21 This section is revised to read: <br /> 22 <br /> 23 The paint system manufacturer's representative shall be present at the jobsite for the pre- <br /> 24 painting conference and for the first day of paint application, and shall be available to the <br /> , <br /> 25 Contractor and Contracting Agency for consultation for the full project duration. <br /> 26 <br /> 27 6-07.3(5) Pre-Painting Conference <br /> I 28 The second paragraph is revised to read: <br /> 29 <br /> 30 If the Contractor's key personnel change between any work operations, an additional <br /> I <br /> 31 conference shall be held if requested by the Engineer. <br /> 32 <br /> 33 6-07.3(6)A Paint Containers <br /> I 34 In item number 2 of the first paragraph, "Federal Standard 595" is revised to read "SAE AMS <br /> 35 Standard 595". <br /> 36 <br /> 37 6-07,1(6)R Paint Storage <br /> I 38 Item number 2 of the second paragraph is revised to read: <br /> 39 <br /> 40 2. The Contractor shall monitor and document daily the paint material storage facility <br /> I <br /> 41 with a high-low recording thermometer device. <br /> 42 <br /> 43 6-07.3(7) Paint Sampling and Testing <br /> I 44 The first two paragraphs are revised to read: <br /> 45 <br /> 46 The Contractor shall provide the Engineer 1 quart of each paint representing each lot. <br /> 47 Samples shall be accompanied with a Safety Data Sheet. <br /> I48 <br /> 49 If the quantity of paint required for each component of the paint system for the entire <br /> 50 project is 20 gallons or less, then the paint system components will be accepted as <br /> I 51 specified in Section 9-08.1(7). <br /> 52 <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> 1 STATE FUND#HLP PB17(014); COE#PW3688 Page AM-45 <br />